Parcel: 13216600A


Addresses:

4410 S PARK AV


Inspection Status: Partial Pass

Inspection History: For trash and recycling enclosures

Permit Number - TD-DEV-0423-00198

Inspection Description - For trash and recycling enclosures

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/07/2025 For trash and recycling enclosures Partial Pass Okay to grout per B. Olmstead
01/22/2025 For trash and recycling enclosures Partial Pass Okay to grout first lift of wall.
01/24/2025 For trash and recycling enclosures Partial Pass Okat to pour
02/13/2025 For trash and recycling enclosures Partial Pass Rebar Reinforcement in place for grout. Grout at risk because we don’t have a note from architect that stack bond is acceptable. Plans call for running bond.
08/29/2025 For trash and recycling enclosures Partial Pass 8/29/25.
Apron/ramp. Compaction test good, submit to portal. Slope correct. Rebar to plan. Dowels in place on forms. Okay to pour.
09/04/2025 For trash and recycling enclosures Partial Pass 9/4/25
2nd RE- at SW corner of site. TSM Double RE. Bollards and Footer to be monolithic pour. Reinforcing correct. Layout and Footer dimensions are correct. Inside Bollards correct. Bollard/Hinges for gates will also be wet set into footer at ends of wall. Okay to Pour Footer/Bollards.
Good Subgrade compaction test needed for slab. Call in inspections for slab and wall.
09/22/2025 For trash and recycling enclosures Partial Pass 9/22/25
South refuse container.- Walls at 6 feet, reinforcing correct, bond beam in place. Weep holes are at the slab in reinforced vertical cells. OK to grout refuse enclosure walls. Vibrate grouted cells without weeps.
Call us back out to inspect mat etc before pouring floor.
10/06/2025 For trash and recycling enclosures Partial Pass 10/6/25 SW RE
RE floor and apron. Compaction test good, submit to portal. Slope correct. Rebar to plan. Dowels in place on forms. Okay to pour floor and apron. May need a header at joint between landscape and apron.
11/13/2024 For trash and recycling enclosures Partial Pass
11/15/2024 For trash and recycling enclosures Partial Pass Okay to pour footing & Bollards. Gate Posts will pour with slab & Apron