Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0423-00198
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | For trash and recycling enclosures | Partial Pass | Okay to grout per B. Olmstead | |
| 01/22/2025 | For trash and recycling enclosures | Partial Pass | Okay to grout first lift of wall. | |
| 01/24/2025 | For trash and recycling enclosures | Partial Pass | Okat to pour | |
| 02/13/2025 | For trash and recycling enclosures | Partial Pass | Rebar Reinforcement in place for grout. Grout at risk because we don’t have a note from architect that stack bond is acceptable. Plans call for running bond. | |
| 08/29/2025 | For trash and recycling enclosures | Partial Pass | 8/29/25. Apron/ramp. Compaction test good, submit to portal. Slope correct. Rebar to plan. Dowels in place on forms. Okay to pour. |
|
| 09/04/2025 | For trash and recycling enclosures | Partial Pass | 9/4/25 2nd RE- at SW corner of site. TSM Double RE. Bollards and Footer to be monolithic pour. Reinforcing correct. Layout and Footer dimensions are correct. Inside Bollards correct. Bollard/Hinges for gates will also be wet set into footer at ends of wall. Okay to Pour Footer/Bollards. Good Subgrade compaction test needed for slab. Call in inspections for slab and wall. |
|
| 09/22/2025 | For trash and recycling enclosures | Partial Pass | 9/22/25 South refuse container.- Walls at 6 feet, reinforcing correct, bond beam in place. Weep holes are at the slab in reinforced vertical cells. OK to grout refuse enclosure walls. Vibrate grouted cells without weeps. Call us back out to inspect mat etc before pouring floor. |
|
| 10/06/2025 | For trash and recycling enclosures | Partial Pass | 10/6/25 SW RE RE floor and apron. Compaction test good, submit to portal. Slope correct. Rebar to plan. Dowels in place on forms. Okay to pour floor and apron. May need a header at joint between landscape and apron. |
|
| 11/13/2024 | For trash and recycling enclosures | Partial Pass | ||
| 11/15/2024 | For trash and recycling enclosures | Partial Pass | Okay to pour footing & Bollards. Gate Posts will pour with slab & Apron |