Permit: TD-DEV-0324-00089
Permit Details
Apply Date:
03/15/2024
Applicant:
Avery Hall
Description:
Minor development of Existing Circle K facility with addition of Diesel fueling stations and associated improvements.
Permit Reviews
Permit Number - TD-DEV-0324-00089
Permit Status: Issued
Permit Description: Minor development of Existing Circle K facility with addition of Diesel fueling stations and associated improvements.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/14/2024 | REQUIRES RESUBMIT |
| 12/02/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/07/2025 | REQUIRES RESUBMIT |
| 08/14/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 10/30/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | DEVELOPMENT PACKAGE NEW v.4 | 05/09/2025 | REQUIRES RESUBMIT |
| 12/23/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/06/2026 | REQUIRES RESUBMIT |
| 03/19/2025 | DEVELOPMENT PACKAGE NEW v.3 | 04/09/2025 | REQUIRES RESUBMIT |
| 05/13/2025 | DEVELOPMENT PACKAGE NEW v.5 | 05/28/2025 | APPROVED |
| 03/17/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 03/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0324-00089
Permit Status: Issued
Permit Description: Minor development of Existing Circle K facility with addition of Diesel fueling stations and associated improvements.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/05/2026 | Prior to final - needs review for requests for information, AS-Built will need to be submitted |
| 09/12/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0324-00089
Permite Description: Minor development of Existing Circle K facility with addition of Diesel fueling stations and associated improvements.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | ENGR - Drainage Structures | N/A | Partial Pass | Okay to begin wrapping and backfilling with rock. Letter of acceptance from engineer of record will be required due to subgrade, rock, filter fabric, and chamber installation without inspection. |
| 03/20/2026 | For trash and recycling enclosures | N/A | Partial Pass | 3/20/26 Footer for Refuse Enclosure. Correct to plans and details in the Bldg. plans S1.0, S2.1, S2.2. Footer dimensions and reinforcing correct for 6' walls per detail 8 on S2.1 #6 verts @ 24'OC. #5 continuous Horz. Lapped at 54" per lap table. Schedule pre grout inspection when ready with 1st lift so we can check vert laps (43") and bond beam. Okay to pour footer and bollards. |
| 05/04/2026 | ENGR Paving | N/A | Not Ready | contractor needs to clean up the subgrade and put in some hubs so we can get to a true grade in the sub grade before place an AB |
| 05/07/2026 | N/A | In Field for Revision | contractor needs to get a hold of the engineer of record to redesign the sidewalk on the north side of the building. Engineering design it per city of Tucson specifications. | |
| 05/13/2026 | N/A | Partial Pass | contractor is good to pave. Informed the contractor that the AB needs a little more water before paving |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0324-00089
Permit Description: Minor development of Existing Circle K facility with addition of Diesel fueling stations and associated improvements.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/22/2026 | Consultation SITE | Passed | Discussed As-Built requirements, and non-compliant crosswalk on Southeast connection. | |
| 06/05/2026 | SITE - Zoning Final | Passed | Zoning requirements have been met for this project. | |
| 06/11/2026 | ENGR Engineering Final | Passed |