Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | ENGR Engineering Final | Not Ready | Remaining items to finish the development package: Finish handrail (with 12" extension loops) for north side pedestrian ramp. Install doors on dumpster enclosure. Hydroseed south basin. Correct tree stakes. Remove construction dumpster and fencing. |
|
| 06/11/2026 | ENGR Engineering Final | Passed |