Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2026 | Partial Pass | contractor is good to pave. Informed the contractor that the AB needs a little more water before paving |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2026 | Partial Pass | contractor is good to pave. Informed the contractor that the AB needs a little more water before paving |