Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2026 |
Consultation SITE |
|
Partial Pass |
okay to place the AB on to the sub grade |
| 05/07/2026 |
Consultation SITE |
|
Partial Pass |
contractors continuing to place AB for the parking lot and the drive-through area west side of the building over by the gas pumps |
| 05/22/2026 |
Consultation SITE |
|
Passed |
Discussed As-Built requirements, and non-compliant crosswalk on Southeast connection. |