Inspection History Details
Inspection Status: In Field for Revision
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | In Field for Revision | contractor needs to get a hold of the engineer of record to redesign the sidewalk on the north side of the building. Engineering design it per city of Tucson specifications. |