Permit: TD-DEV-0225-00040
Permit Details
Status:
Inspections
Type:
Development Package
Address:
N/A
Address NEW:
N/A
Apply Date:
02/03/2025
Applicant:
N/A
Description:
Improvement of existing E Andrada Road for a future solar generation facility.
Permit Reviews
Permit Number - TD-DEV-0225-00040
Permit Status: Inspections
Permit Description: Improvement of existing E Andrada Road for a future solar generation facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | DEVELOPMENT PACKAGE NEW v.3 | 05/22/2025 | REQUIRES RESUBMIT |
| 02/06/2025 | DEVELOPMENT PACKAGE NEW v.1 | 04/01/2025 | REQUIRES RESUBMIT |
| 04/02/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/02/2025 | REQUIRES RESUBMIT |
| 05/22/2025 | DEVELOPMENT PACKAGE NEW v.4 | 06/03/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0225-00040
Permite Description: Improvement of existing E Andrada Road for a future solar generation facility.
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2025 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | There are areas along the road that erosion issues that need to be addressed contractor has opened up another area just north of the new road that was installed to install track rock and wattles along the property line on the north end |
| 08/18/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time. I did drive that road and it cut some new roads in going south that belongs to Pima county. |
| 02/06/2026 | ENGR Grading Final | N/A | Not Ready | Discussed corrections in consultation inspection. |
| 02/06/2026 | Consultation SITE | N/A | Partial Pass | Discussed RFI for shifting low water crossings to align with actual wash locations. RFI will be emailed for review prior to shifting of location. |
| 07/21/2025 | N/A | Partial Pass | I drove the road. It’s still in good condition after all the rains we’ve had. No concerns at this time on the grading | |
| 07/07/2025 | Grading Progress ENGR | N/A | Partial Pass | contractor continues to place AB along the road. I also asked the contractor to start stationing the road so we we can locate. The RCP’s. |
| 05/29/2026 | N/A | Partial Pass | 24” backfill completed. AB installed at next crossing west. | |
| 06/17/2025 | SITE - Zoning Final | N/A | Partial Pass | contractor called me in for rough grading. Right now they’re grabbing and clearing the roadway. There’s a saguaro cactus in the middle of the roadway that needs to be relocated. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0225-00040
Permit Description: Improvement of existing E Andrada Road for a future solar generation facility.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | inform the contractor that we need to review all the test results by the third-party contractor needs to put in all the truck out, rock per plan and silt fence. Contractor will call in inspection twice a week for the first two weeks. | |
| 04/15/2026 | Consultation SITE | Passed | contractor had questions about realigning the road if we look at page C 14 the alignment jogs a little bit and they want to keep it per plan. |