Inspection Status: Partial Pass
Inspection History: Grading Progress ENGR
| Date |
Description |
Inspector |
Results |
Comments |
| 04/09/2026 |
Grading Progress ENGR |
|
Partial Pass |
contractors laying out the areas that take that articulated rock won’t start to install the articulated rock until Monday |
| 04/22/2026 |
Grading Progress ENGR |
|
Partial Pass |
everything looks pretty good as of right now. Looks like they’re installing everything per plan. I asked for the density reports they will give them to me tomorrow. |
| 04/23/2026 |
Grading Progress ENGR |
|
Partial Pass |
contractor continues to work on his second low water crossing, but still does not have any test results for compaction was informed that they will have it on Monday |
| 04/28/2026 |
Grading Progress ENGR |
|
Partial Pass |
contractor continues to build up the low water areas |
| 06/01/2026 |
Grading Progress ENGR |
|
Partial Pass |
28+00 contractor installed the bedding sand and it looks like they have the compaction there, but I do not have the results yet. Contractor is not on site today. There’s no activity. |
| 07/07/2025 |
Grading Progress ENGR |
|
Partial Pass |
contractor continues to place AB along the road. I also asked the contractor to start stationing the road so we we can locate. The RCP’s. |