Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0225-00040
Parcel: Unknown

Address: Unknown

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0225-00040
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/14/2025 Traffic Engineering Review Standard APPROVED Traffic Engineering has no comments at this time.
03/12/2025 External Reviewers - Pima County Addressing Standard NOT REQUIRED Good afternoon,



This project does not require review by Pima County Addressing.





Nicholas Jordan

Site Review Project Manager II – Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
02/25/2025 Fire New Construction Standard NOT REQUIRED
02/13/2025 OK to Submit - Zoning Fast NOT REQUIRED
03/04/2025 ROW Engineering Review Standard NOT REQUIRED
03/19/2025 Site Landscape Standard NOT REQUIRED
03/18/2025 Site Zoning Standard NOT REQUIRED
03/28/2025 CDRC Post Review Express PENDING ASSIGNMENT
03/18/2025 Floodplain Administration Review Standard REQUIRES RESUBMIT 1) Tech Stnd Sec.10-01.3.1: The lease designates the access road approximately 5,700 feet from S Wilmot Rd as a "Public Road" therefore, due to braided floodplain conditions for this watershed, the proposed cross sections for this portion of the access roadway shall all have header curb and asphalt (or concrete) for top portion of the pavement structure. No sidewalk is required. Revise 2, 3, & 4 on plan sheet C701 or other appropriate details on plan sheets.
2) Tech Stnd Sec.4-04.6.6: Provide scour calculations in drainage statement for dip crossing locations to define depth for surface ford concrete walls / header curb / cutoff walls at both sides of each wash dip crossings.
3) Tech Stnd Sec.4-04.10.3.9: Label proposed culverts shall be reinforced concrete, updating table on detail 5 on sheet C701.
4) Tech Stnd Sec.26.40(8): Revise silt fence detail on sheet C700 to not show earth material buildup above grade on upstream side of silt fence - as the build-up can potentially cause redirection of runoff to increase flowrate along silt fence, (instead allowing the silt fence to filter runoff and continue to correct flow direction/pattern), until fence fails at one concentration point.
5) Tech Stnd Sec.4-04.5.2.2: Add note to plans that explains maintenance responsibility of Public Road.
6) UDC sec. 5.7.5.A.4: Address the following comments pertaining to Environmental Resource Zone (ERZ) Overlay Code:
a. Label each ERZ floodplain crossing.
b. Provide a minimum of six feet in height for vertical clearance over each ERZ watercourse.
c. Explain in Drainage Report, how the angled flow will not migrate if the crossing is not perpendicular to flow direction.
d. ERZ-ERR report shall be provided as an addendum to the drainage statement. Report shall be organized based on Tech Stnd Sec 4-02.2.5.B.1.a-x. Call for guidance.
7) Tech Stnd Sec.4-04.2.1: Provide a Drainage Statement.
Elizabeth Leibold P.E., CPM, CFM, Civil Engineer, City of Tucson 520-429-4905 elizabeth.leibold@tucsonaz.gov
03/19/2025 NPPO Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: IMPROVEMENT OF EXISTING E ANDRADA ROAD FOR A FUTURE SOLAR GENERATION FACILITY
ACTIVITY NO: TD-DEV-0225-00040
PARCEL: 30522004A
ZONING: RH - RURAL HOMESTEAD
LAND USE: SOLAR FACILITY

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Upon review of aerial images of the site, it appears that protected native vegetation may be present within the proposed alignment of the access road improvement. Please provide a NPPO that shows preservation of existing protected native plants near the grading limits of the road. The preserve in place plants near the grading limit shall include protective fencing linework on the NPPO that depicts the fence placement at or beyond the dripline of the plants being protected in place and a detail of the fence. Since there will be no irrigation water available for transplant and mitigation plant material it is suggested that the viable transplants be placed in a container and offered to local nursery(s) of your choosing as contribution to their reserve stock of protected native plants. Or offered to the City of Tucson Parks Department for their use on current and future projects. This option has not been proposed in the past, but we believe that this effort towards conservation of the protected native plants to be used elsewhere, meets the intent of the Native Plant Preservation Ordinance. If additional information is needed with regard to the NPPO, details, etc., please reach out. My contact information is attached.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
03/18/2025 Site Engineering Standard REQUIRES RESUBMIT See floodplain administration comments

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
02/06/2025 CDRC Application Completeness Express REVIEW COMPLETED
02/13/2025 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added Addressing and TEP PAG, USPS, SWG to the workflow. Review request email sent to Addressing and TEP. FYI email sent to PAG, USPS, SWG.
03/07/2025 Commercial Plumbing Standard REVIEW COMPLETED
02/13/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/13/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
03/28/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED March 27, 2025
WO#T142219
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Wilmot Energy Center II
TD-DEV-0225-00040
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 2/13/2025. There are existing facilities within the development which are
depicted upon the plan. There are multiple locations where TEP facilities will be
affected by the new development. Relocations of TEP facilities will be required due to
grade changes, culvert, drainage and new development locations. Further, there is a
pole line on the North side of the Andrada road that is owned by TRICO. Please
contact TRICO for a response for their respective facilities. Additionally, please see
recorded instruments for existing facilities, attached.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
02/13/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/11/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
03/12/2025 ROW Engineering Review Standard REVIEW COMPLETED DTM ROW Engineering has no comments at this time.

If you have any questions, please contact Richard Leigh at Richard Leigh at richard.leigh@tucsonaz.gov
03/07/2025 Transportation Landscape Review Standard REVIEW COMPLETED see comments on plan on file
03/07/2025 Transportation Landscape Review Standard REVIEW COMPLETED see comments on plans on file