Permit: TD-DEV-0225-00040

Parcel: 305030230


Addresses:

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
05/26/2026 Partial Pass contractor excavated for 24 inch RCP pipe at station 35+80. Terracon on site to test the subgrade. Terracon informed the contractor that the trench needed water because the moisture was too low.
Contractor pour water into the trench and is waiting for it to perked out into the ground so they can get the proper moisture for the subgrade
05/27/2026 Partial Pass The contractor is installing 24 inch RCP pipes at station 35+80.
Contractor will call in another inspection when they have completed installing the pipes and before they start back, filling it up to spring line
05/28/2026 Partial Pass contractor, good to backfill the 24 inch RCP pipe at station 35+80
Terracon is on site to take the densities and everything passed up to spring line
05/29/2026 Partial Pass 24” backfill completed. AB installed at next crossing west.
06/04/2026 Re-inspection required Discussed elevation concerns with contractor, advised that we recommend installation of RCP be halted until engineering can review the situation.