Permit: TD-DEV-0224-00033
Permit Details
Status:
Issued
Type:
Development Package
Address:
3114 N ALVERNON WY
Address NEW:
3114 N ALVERNON WY
Apply Date:
02/02/2024
Applicant:
Jeffrey Stanley
Description:
Revision 2 - Multifamily Development - Hamlet One on North Alvernon
Permit Reviews
Permit Number - TD-DEV-0224-00033
Permit Status: Issued
Permit Description: Revision 2 - Multifamily Development - Hamlet One on North Alvernon
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2024 | DEVELOPMENT PACKAGE NEW v.3 | 05/07/2024 | APPROVED |
| 04/17/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/17/2026 | REQUIRES RESUBMIT |
| 04/02/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/03/2024 | REQUIRES RESUBMIT |
| 05/29/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 06/17/2026 | APPROVED |
| 04/27/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 05/27/2026 | REQUIRES RESUBMIT |
| 02/02/2024 | DEVELOPMENT PACKAGE NEW v.1 | 03/18/2024 | REQUIRES RESUBMIT |
| 01/30/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0224-00033
Permit Status: Issued
Permit Description: Revision 2 - Multifamily Development - Hamlet One on North Alvernon
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/09/2025 | CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0224-00033
Permite Description: Revision 2 - Multifamily Development - Hamlet One on North Alvernon
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2024 | SPEC - Site Preparation (Third Party) | N/A | Partial Pass | Marc Wolfe (650) 930-0180 or Mike Haggerty (520) 260-7857 |
| 06/14/2024 | N/A | Partial Pass | Initial grading on first 4 pads. Will return for follow up on basin cuts and balance of pads | |
| 07/02/2024 | For trash and recycling enclosures | N/A | Partial Pass | Okay to pour wall footing. Verify clearance from center column verts to block dimensions. |
| 11/05/2024 | Grading Progress ENGR | N/A | Partial Pass | Contractor still needs to dress up the grading the basins in the front. I need to dress them up and finish it and put the rip wrap in. |
| 04/11/2025 | N/A | Partial Pass | Curb access ramps forms between units 6 and 7 have correct slopes. Basin c outlet weir width has been adjusted to 17.5’ in order for abutting curb ramps to have correct slope. Cross slopes and running slopes on forms are correct. Flatwork is ready to pour in front of units 6 and 7 |
|
| 10/06/2025 | ENGR Paving | N/A | Partial Pass | 10/6/25 Submit and ABC compaction reports to the portal. Some Touchup needs to be completed at a few curb edges, low points in front of scuppers. But it is minor and when touched up it is ready. Curb Reveals correct for 2" AC and Blue top grade markers are correct. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0224-00033
Permit Description: Revision 2 - Multifamily Development - Hamlet One on North Alvernon
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2024 | Passed | |||
| 06/13/2024 | PDSD Engineering Division Pre-Construction SITE | Passed |