Permit Number: TD-DEV-0224-00033
Parcel: 11006021A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0224-00033
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2024 External Reviewers - Pima County Addressing APPROVED Good afternoon,
Pima County Addressing approves TD-DEV-0224-00033. The project will keep 3114 N Alvernon WY. 3116 N Alvernon Wy will be retired.

Nicholas Jordan
Site Review Project Manager – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
03/18/2024 CDRC Post Review Express PENDING ASSIGNMENT
03/18/2024 Commercial Plumbing REQUIRES RESUBMIT 1. The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018.
2. The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is higher than the first floor elevations of buildings 2, 3, and 7. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.
3. The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is less than 12” below the first floor elevations of buildings 1, 5, and 6. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.
4. The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is more than 12”below the first floor elevation of building 4 (2415.70’). A backwater valve shall not be installed per Section 714.1, IPC 2018, as amended by the City of Tucson.
02/29/2024 External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT February 29, 2024
WO#T104635
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: HAMLET ONE ON NORTH ALVERNON
TD-DEV-0224-00033
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 2/9/2024. There are possible conflicts, including existing facilities and omitted easement Dk. 4695 Pg. 330, verification will be needed to confirm this will not conflict with existing facilities. Further, TEP faciliites are not depicted upon the submitted plans, including a TEP underground transformer identified on attached map, page 2/9.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our land Resources Department,
TEPDEVREV@tep.com.
Should you have any technical questions, please contact the area designer,
Ryan Romero
(520) 240-4575
ryanromero@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
03/14/2024 NPPO REQUIRES RESUBMIT NPPO is approved but missing full development package ID #.
03/11/2024 ROW Engineering Review REQUIRES RESUBMIT TD-DEV-0224-00033
3114 N. Alvernon Rd.

Comments:
1. The existing driveway apron is out-of-compliance with current standards and must be replaced with a new concrete driveway apron per P.A.G. standard 206.
2. The existing sidewalk must be evaluated by an inspection for compliance with current standards.
3. Where adjoining sidewalk from the on-site circulation path, ties to sidewalk along the ROW frontage, a 5’ X 5’ ADA landing is required. Landings shall be 5’ X 5’ and not to exceed a 2% cross slope in all directions.

David Stiffey
DTM Project Coordinator
David.Stiffey@tucsonaz.gov
03/11/2024 Site Engineering REQUIRES RESUBMIT Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview
The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
TD-DEV-0224-00033
1. Provide a table similar to Table 2.3 in the DSSDR that shows the volume of each basin and how much retention it contributes.

Lianne Evans
lianne.evans@tucsonaz.gov
03/14/2024 Site Landscape REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-0224-00033
ADDRESS/PARCEL: 3114-3116 N ALVERNON/110-06-020J
ZONING: R-3, MH-1

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

COMMENTS:
1. Ensure all Zoning and Engineering comments are addressed prior to the Landscape/NPPO comments.
2. Please label all existing and future rights of way for N Alvernon 7.6.4.C.2.a. on all sheets
3. Show all site visibility triangles on plan set sheets.
4. DTM approval is required for any and all planting or irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (David.marhefka@tucsonaz.gov)
5. Identify curb inlets/splash pads to landscape areas on grading and water harvesting plans.
6. Show directional arrows for roof drainage on the roof building.
7. The Commercial Rainwater Harvesting Plan must utilize the Site Water Budget). See TSM 4-01.0.0 Exhibit A. The Site Water Budget is how the Water Dept tracks the irrigation water use on-site, not first flush retention volume charts.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
03/05/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Hamlet One on N. Alvernon
Development Package (1st Review)
TD-DEV-0224-00033

TRANSMITTAL DATE: March 5, 2024

DUE DATE: March 11, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 01, 2025.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0224-00033, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.6.a – As Alvernon Wy. is designated as an Arterial on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)

2-06.4.7.A.8 - For development package documents provide:

3. COMMENT: 2-06.4.7.A.8.b – Provide a lot coverage calculation that meets the requirements of UDC Article 6.4.3 on the plan.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

4. COMMENT: 2-06.4.9.E – As this site is made up of two (2) parcels, 110-06-0210 & 111-05-002A, a lot combination is required. Provide a copy of the approved Pima County Assessor’s Office Combo Request with the next submittal.

5. COMMENT: 2-06.4.9.H.5.a – Clearly show all vehicle parking spaces on the plan.

6. COMMENT: 2-06.4.9.H.5.a – Detail 2 sheet 4 the wheel stop location is not correct. Review UDC Article 7.4.6.H.3 and provide the correct location dimension.

7. COMMENT: 2-06.4.9.H.5.d – Clearly demonstrate how the requirement of UDC Article 7.4.9.B.1.e are met for the proposed short-term bicycle parking.

8. COMMENT: 2-06.4.9.J – Show the future curb and sidewalk location on the plan.

9. COMMENT: 2-06.4.9.O – The street perimeter yard setback listed on sheet 1 is not correct. Review UDC Article 6.4.5.C.2 and provide the correct required street perimeter yard setback.

10. COMMENT: 2-06.4.9.O – The interior perimeter yard setbacks listed on sheet 1 are not correct. Review UDC Table 6.3-2.A and provide the correct required perimeter yard setbacks.

11. COMMENT: 2-06.4.9.O – Provide perimeter yard setback dimensions from Units 3 & 7 and the storage units, called out under Keynote 41 to the east property line.

12. COMMENT: 2-06.4.9.Q – Provide the height and square footage of the storage units, called out under Keynote 41 within the footprint.

13. COMMENT: 2-06.4.9.R – Per TSM Section 7-01.4.1.F Sidewalks or pedestrian refuge areas cannot be located between any motor vehicle parking space and the PAAL providing access to that space. That said the sidewalks running behind all of the vehicle parking spaces are not allowed in that area.

14. COMMENT: 2-06.4.9.R – Clarify what the crosswalk shown about midway along the PAAL is for, as it is not required.

15. COMMENT: 2-06.4.9.W – Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Also, provide a note stating all signs require separate permits.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
02/02/2024 CDRC Application Completeness Express REVIEW COMPLETED Address on plans is correct however the parcel number appears to be wrong as it is located in Pima County.
02/08/2024 CDRC Review Coordinator Express REVIEW COMPLETED Addressing review required per SOP. Review request email TEP. CDRC sent FYI email to PAG, USPS, SWG.
02/08/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/08/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/08/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
03/04/2024 Fire New Construction REVIEW COMPLETED john.vincent@tucsonaz.gov
5203495581
02/07/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
02/07/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
02/05/2024 OK to Submit - Zoning Fast REVIEW COMPLETED