Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | Partial Pass | Contract is good to pour the sidewalks in the scuppers on the north side of the project here | ||
| 04/11/2025 | Partial Pass | Curb access ramps forms between units 6 and 7 have correct slopes. Basin c outlet weir width has been adjusted to 17.5’ in order for abutting curb ramps to have correct slope. Cross slopes and running slopes on forms are correct. Flatwork is ready to pour in front of units 6 and 7 |
||
| 05/14/2025 | Partial Pass | Contractor can pull the sidewalk area | ||
| 05/20/2025 | Partial Pass | Contractors good to pour the sidewalk area. This is the second time I looked at it and passed it. |