Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0224-00033
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/01/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | May 1, 2024 WO#T104635 City of Tucson Planning and Development Services CDRC Admin Team Dear CDRC Admin Team Subject: Second Submittal HAMLET ONE ON NORTH ALVERNON TD-DEV-0224-00033 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 4/2/2024. There are existing facilities within the development which are depicted upon the plan; however, there do not appear to be any conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Ryan Romero (520) 240-4575 RYANROMERO@TEP.COM Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 04/29/2024 | NPPO | APPROVED | |||
| 04/30/2024 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
| 05/01/2024 | Site Engineering | APPROVED | |||
| 04/29/2024 | Site Landscape | APPROVED | |||
| 05/01/2024 | Site Zoning | APPROVED | |||
| 05/03/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 05/03/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Comment not resolved; the HCS for building 2 requires a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is higher than the first floor elevations of buildings 2, 3, and 7. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.] 2. Comment not resolved; the HCS for building 1 requires a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is less than 12” below the first floor elevations of buildings 1, 5, and 6. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.] 3. Comment not resolved; the HCS for building 4 shall NOT have a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is more than 12”below the first floor elevation of building 4 (2415.70’). A backwater valve shall not be installed per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
||
| 04/02/2024 | CDRC Application Completeness Express | REVIEW COMPLETED |