Permit Number: TD-DEV-0224-00033
Parcel: 11006021A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0224-00033
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/01/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED May 1, 2024
WO#T104635
City of Tucson
Planning and Development Services
CDRC Admin Team
Dear CDRC Admin Team
Subject: Second Submittal HAMLET ONE ON NORTH ALVERNON
TD-DEV-0224-00033
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 4/2/2024. There are existing facilities within the development which are
depicted upon the plan; however, there do not appear to be any conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our land Resources Department,
TEPDEVREV@tep.com.
Should you have any technical questions, please contact the area designer,
Ryan Romero
(520) 240-4575
RYANROMERO@TEP.COM
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
04/29/2024 NPPO APPROVED
04/30/2024 ROW Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
05/01/2024 Site Engineering APPROVED
04/29/2024 Site Landscape APPROVED
05/01/2024 Site Zoning APPROVED
05/03/2024 CDRC Post Review Express PENDING ASSIGNMENT
05/03/2024 Commercial Plumbing REQUIRES RESUBMIT 1. Comment not resolved; the HCS for building 2 requires a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is higher than the first floor elevations of buildings 2, 3, and 7. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.]
2. Comment not resolved; the HCS for building 1 requires a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is less than 12” below the first floor elevations of buildings 1, 5, and 6. Provide backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.]
3. Comment not resolved; the HCS for building 4 shall NOT have a backwater valve. [Initial comment: The rim elevation of the next upstream sanitary manhole (4674-02, 2413.86’) is more than 12”below the first floor elevation of building 4 (2415.70’). A backwater valve shall not be installed per Section 714.1, IPC 2018, as amended by the City of Tucson.]
04/02/2024 CDRC Application Completeness Express REVIEW COMPLETED