Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.2
Permit Number - TD-DEV-0224-00033
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/20/2026 | Commercial Plumbing Standard | APPROVED | |||
| 05/20/2026 | Site Landscape Standard | APPROVED | |||
| 05/15/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0224-00033 (REV 2 – 1st Review) Project: Rev 2 - Multifamily Development Location: 3114 N Alvernon WY Review Date: 5/14/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Related Cases: *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. * City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. The revised plans show the short-term bicycle parking on the East end of the development being cut in half by the proposed placement of the new metal fence as referenced by keynote #67. Clean up the line work and provide a separation distance between the new fence and bicycle parking. 2. Provide clarification / more detail in regards to detail #15 for the new rock spillway. Is it intended to be grouted rock, hand-placed, etc? Provide an intended slope for said spillway. 3. Include spot elevations on the grading plan at curb cut inlets, and sidewalk scupper inlets for quick reference during site inspections. 4. Ensure that the new spillway associated with the trash enclosure extends to below the bottom of the basin in compliance with DSSDR 4.8.1.4. If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 05/18/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Krista Hansen – Lead Planner PDSD Zoning Review Section PROJECT: Hamlet One on North Alvernon Development Package (Revision 2 – 1st Review) TD-DEV-0224-00033 (3114 N ALVERNON WY) TRANSMITTAL DATE: 5/18/2026 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 24, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 1. COMMENT: 2-06.3.2 – After relocating the bike rack, the maneuvering area depicted in Detail 7 (pg 4) conflicts with the fence. The bike rack must be a minimum of 2.5 ft from any fence or obstacle. Dimension setback and ensure compliance with UDC 7.4.9.2.f. If you have any questions about this transmittal, contact Krista Hansen at Krista.hansen@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected development package and comment response letter. |
||
| 04/27/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/01/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
| 04/27/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 05/01/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 05/27/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | |||
| 05/05/2026 | ROW Review | REVIEW COMPLETED |