Inspection Status: Partial Pass
Inspection History: Grading Progress ENGR
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2025 |
Grading Progress ENGR |
|
Partial Pass |
Contract is good to pour the sidewalk with a thickened edge |
| 05/14/2025 |
Grading Progress ENGR |
|
Partial Pass |
Contractor pour the sidewalk and they’re still working in the basin area |
| 05/15/2025 |
Grading Progress ENGR |
|
Partial Pass |
See checklist for details. |
| 11/05/2024 |
Grading Progress ENGR |
|
Partial Pass |
Contractor still needs to dress up the grading the basins in the front. I need to dress them up and finish it and put the rip wrap in. |