Permit: TC-RES-0324-01301
Permit Details
Apply Date:
03/05/2024
Applicant:
Emilio Soto
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0324-01301
Permit Status: Issued
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/06/2024 | RESIDENTIAL NEW DWELLING v.1 | 04/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0324-01301
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0324-01301
Permit Status: Issued
Permit Description: SFR
Date | Description | Comments |
---|---|---|
04/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
03/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0324-01301
Permite Description: SFR
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 7/25/24: partial for ufer only 9/13/24: Schedule 40 2 1/2" PVC at pedestal and sub panel must be replaced with schedule 80 PVC, Address tag at pedestal must be replaced, copper piping penetrating Lath must be protected from future contact with stucco, gas piping must be bonded, seal all penetrations going through top plate, seal all penetrations through vapor barrier, nail plates required throughout. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
09/13/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 9/13/24: Schedule 40 2 1/2" PVC at pedestal and sub panel must be replaced with schedule 80 PVC, Address tag at pedestal must be replaced, copper piping penetrating Lath must be protected from future contact with stucco, gas piping must be bonded, seal all penetrations going through top plate, seal all penetrations through vapor barrier, nail plates required throughout. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
09/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 9/13/24: Schedule 40 2 1/2" PVC at pedestal and sub panel must be replaced with schedule 80 PVC, Address tag at pedestal must be replaced, copper piping penetrating Lath must be protected from future contact with stucco, gas piping must be bonded, seal all penetrations going through top plate, seal all penetrations through vapor barrier, nail plates required throughout. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0324-01301
Permit Description: SFR
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | COT - RSPL - Sewer | Passed | 7/12/24: plumbing underground and sewer tie in per plans ok to backfill. Shading required | |
07/12/2024 | COT - RSPL - Rough Soil | Passed | 7/12/24: plumbing underground and sewer tie in per plans ok to backfill. Shading required | |
07/12/2024 | COT - RSPL - Yard Water Line | Passed | 7/12/24: plumbing underground and sewer tie in per plans ok to backfill. Shading required | |
07/25/2024 | COT - RSBU - Preslab | Passed | 7/25/24: reinforcement per plan ok to proceed | |
07/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7/25/24: reinforcement per plan ok to proceed | |
08/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/07/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 8/5/24: king stud missing at sliding door opening, anchor bolt must be properly secured at sill plate at sliding door opening, king stud missing at master bedroom window opening , interior non-bearing walls must have shot pins 24" O.C and 12 from sill plate edge, anchor bolt spacing must be 48" O.C (over spanned throughout, properly secure anchor bolts throughout, properly support H2.5 clips throughout, exterior sheathing not fastened per schedule throughout, truss clacs must be left on site for inspection. 8/7/24: passed |
|
09/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/20/2024 | BULD - Electrical Clearance | Passed | ||
09/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/20/2024 | COT - BULD - SWG Clearance | Passed | 9/20/24: not ready 11/20/24: SWG CLEARANCE OK FOR METER TAG |