Permit: TC-MDP-0724-00847
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5563 S SWIRES RD
Address NEW:
5563 S SWIRES RD
Apply Date:
07/30/2024
Applicant:
Inai Maldonado
Description:
SFR Model Plan (Model master plan TC-MDP-0424-00532)
Permit Reviews
Permit Number - TC-MDP-0724-00847
Permit Status: Complete
Permit Description: SFR Model Plan (Model master plan TC-MDP-0424-00532)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/17/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 01/07/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | RESTAMP - RESIDENTIAL v.1 | 06/23/2025 | APPROVED |
| 08/01/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 08/20/2024 | REQUIRES RESUBMIT |
| 09/25/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 10/08/2024 | REQUIRES RESUBMIT |
| 02/11/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 02/25/2025 | REQUIRES RESUBMIT |
| 04/08/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/08/2026 | APPROVED |
| 09/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/15/2025 | APPROVED |
| 06/06/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 | 06/23/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00847
Permit Status: Complete
Permit Description: SFR Model Plan (Model master plan TC-MDP-0424-00532)
| Date | Description | Comments |
|---|---|---|
| 02/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 08/16/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00847
Permite Description: SFR Model Plan (Model master plan TC-MDP-0424-00532)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | COT - RSBU - Preslab | N/A | Re-inspection required | 8-25-25: missing ufer, add chairs to all diagonal #4's, clean footings of excess debris/loose dirt, and compact section of pad along the northwestern portion of home. |
| 09/26/2025 | COT - RSBU - Interior Shear Bracing | N/A | Canceled | 9-26-25: schedule this inspection when you have drywall installed to verify nailing. |
| 03/06/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 3/6/2026 Outlet in laundry needs to be GFCI, water heater in garage needs disconnect wired, add address number at front building visible from street - minimum 4" in height. Paint plastic pipes outside, cut cleanout flush to grade in front, secure AC condensate line on roof with redwood block and secure electrical whip. |
| 03/06/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 3/6/2026 Outlet in laundry needs to be GFCI, water heater in garage needs disconnect wired, add address number at front building visible from street - minimum 4" in height. Paint plastic pipes outside, cut cleanout flush to grade in front, secure AC condensate line on roof with redwood block and secure electrical whip. |
| 03/06/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 3/6/2026 Outlet in laundry needs to be GFCI, water heater in garage needs disconnect wired, add address number at front building visible from street - minimum 4" in height. Paint plastic pipes outside, cut cleanout flush to grade in front, secure AC condensate line on roof with redwood block and secure electrical whip. |
| 03/06/2026 | RSBU - Building Final | N/A | Re-inspection required | 3/6/2026 Outlet in laundry needs to be GFCI, water heater in garage needs disconnect wired, add address number at front building visible from street - minimum 4" in height. Paint plastic pipes outside, cut cleanout flush to grade in front, secure AC condensate line on roof with redwood block and secure electrical whip. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00847
Permit Description: SFR Model Plan (Model master plan TC-MDP-0424-00532)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2025 | COT - RSPL - Backwater Valve | Passed | 8.11.25 Approved |
|
| 08/11/2025 | COT - RSPL - Sewer | Passed | 8.11.25 Approved |
|
| 08/11/2025 | COT - RSPL - Rough Soil | Passed | 8.11.25 Approved |
|
| 08/15/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 08/27/2025 | COT - RSBU - Preslab | Passed | 8.27.2025 Corrections made from 8.25.2025 inspection, okay to proceed. |
|
| 08/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8.27.2025 Corrections made from 8.25.2025 inspection, okay to proceed. |
|
| 09/26/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9-26-25: exterior clips/sheathing & framing approved. Okay to continue with construction. | |
| 09/26/2025 | COT - RSBU - Roof Nailing | Passed | 9-26-25: okay to dry in roof. | |
| 11/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.03.2025 Approved. Added nail plate to oven vent at top plate, lowered thermostat to 48", fire foamed penetration. |
|
| 11/03/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | 11/10/2025 approved. | |
| 12/16/2025 | COT - RSEL - Electrical Underground | Passed | 12/16/2025 Approved. Schedule 40 conduit trenched to transformer with a 20ft run - okay to backfill with shading materials. |
|
| 12/16/2025 | BULD - Electrical Clearance | Passed | 12/16/2025 Clearance to TEP ECO. |
|
| 03/06/2026 | ENGR Engineering Final | Passed | ||
| 03/06/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/11/2026 | COT - RSEL - Electrical Final | Passed | 03/11/2026 Corrections made to prior insertion. |
|
| 03/11/2026 | COT - RSME - Mechanical Final | Passed | 03/11/2026 Corrections made to prior insertion. |
|
| 03/11/2026 | COT - RSPL - Plumbing Final | Passed | 03/11/2026 Corrections made to prior insertion. |
|
| 03/11/2026 | RSBU - Building Final | Passed | 03/11/2026 Corrections made to prior inspection. |