Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2025 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
9-24-24: missing bathroom/shower reinforcement, shot pins must be installed within 6" at the end of each plate & spaced at 24" o.c., add anchor bolts where installed closer than in the middle third of sill plate-tighten all anchor bolts, exterior nailing at sheathing not per plans-add nails add joints/edges. Nails can be no close than 3/8" from edges/joints and cannot over penetrate more than 1/16", missing H-25's at ledger-see detail H, Nail H-25 at entryway, add nails throughout roof decking-checking spacing and add nails where overpenetrated. |
| 09/26/2025 |
COT - RSBU - Roof NailingĀ |
|
Passed |
9-26-25: okay to dry in roof. |