Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | RSBU - Building Final | Re-inspection required | 3/6/2026 Outlet in laundry needs to be GFCI, water heater in garage needs disconnect wired, add address number at front building visible from street - minimum 4" in height. Paint plastic pipes outside, cut cleanout flush to grade in front, secure AC condensate line on roof with redwood block and secure electrical whip. |
|
| 03/11/2026 | RSBU - Building Final | Passed | 03/11/2026 Corrections made to prior inspection. |