Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
08/16/2024
Applicant:
Mark Alteri
Description:
PV 1520 SFR

Permit Reviews

Permit Number - TC-MDP-0724-00790
Permit Status: Inspections
Permit Description: PV 1520 SFR
Start Date Submittal Complete Date Status  
08/22/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/22/2024 REQUIRES RESUBMIT Review Details
09/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 09/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00790
Permit Status: Inspections
Permit Description: PV 1520 SFR
Total Outstanding Activity Conditions - 4
Date Name
07/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/24/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/24/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00790
Permit Status: Inspections
Permit Description: PV 1520 SFR
Date Description Comments
07/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00790
Permit Description: PV 1520 SFR
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/21/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 10/21/2024
10/21/2024 COT - RSPL - Sewer Passed
10/21/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 10/21/2024
10/25/2024 COT - RSEL - Electrical Underground Passed
10/25/2024 COT - RSEL - Grounding/Bonding Passed
10/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Corrections made 10/28/24
10/28/2024 COT - RSBU - Preslab Passed Corrections made 10/28/24

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW