Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/18/2024
Applicant:
Description:
GC model 100 duplex

Permit Reviews

Permit Number - TC-MDP-0524-00637
Permit Status: Complete
Permit Description: GC model 100 duplex
Start Date Submittal Complete Date Status  
06/20/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 07/02/2024 REQUIRES RESUBMIT Review Details
07/25/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 08/09/2024 REQUIRES RESUBMIT Review Details
06/20/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/20/2024 REQUIRES RESUBMIT Review Details
09/10/2024 RESTAMP - RESIDENTIAL v.1 09/10/2024 APPROVED Review Details
08/22/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 09/10/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00637
Permit Status: Complete
Permit Description: GC model 100 duplex
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00637
Permite Description: GC model 100 duplex
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
07/17/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
08/04/2025 COT - RSME - Mechanical Final N/A Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.
08/04/2025 RSBU - Building Final N/A Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.
08/04/2025 COT - RSEL - Outdoor Lighting N/A Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.
08/04/2025 COT - RSEL - Electrical Underground N/A Re-inspection required 8-4-25: notes from 7-17-25 indicate not ready. Provide written documentation that underground electric was done per plans and meets the 2018 IRC requirements. Submit to the city for review and approval.
08/04/2025 COT - RSEL - Electrical Final N/A Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.
08/04/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00637
Permit Description: GC model 100 duplex
Total Completed Inspections - 16
Date Description Inspector Results Comments
10/28/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 10/28/2024
12/20/2024 COT - RSBU - Preslab Passed 12/20/24 corrections have been made, ok to proceed.
01/02/2025 COT - RSBU - Preslab and floodplain Passed 1/02/25
Completed by Tom.
01/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
01/07/2025 COT - RSBU - Roof Nailing Passed 1-7-25, roof nailing approved. Okay to continue with construction.
01/07/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1-7-25, exterior clips/sheathing approved. Okay to continue with construction.
01/14/2025 COT - RSPL - Yard Water Line Passed 1/14/25 pass, ok to backfill shading required.
01/14/2025 COT - RSPL - Sewer Passed 1/14/25 pass, ok to backfill shading required.
01/14/2025 COT - RSPL - Backwater Valve Passed 1/14/25 pass, ok to backfill shading required.
02/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 2/25/25 ok to drywall
03/10/2025 COT - RSBU - Interior Shear Bracing Passed Sheetrock nailing: Ok to tape and texture throughout.
04/17/2025 BULD - Electrical Clearance Passed 4-17-25, okay to energize panel. ECO clearance issued to TEP.
07/17/2025 COT - BULD - SWG Clearance Passed 7.17.25
All electric
07/17/2025 RSBU - Building Progress Passed
08/04/2025 COT - RSEL - Grounding/Bonding Passed 8-4-25: approved
08/15/2025 ENGR Engineering Final Passed All previous items have been corrected

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
FINAL_ELEVATION CERTIFICATE 1691 S. SAN JOSE DR_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
C1 1691 - SITE PLAN V_4_V3_V1.PDF DOCUMENTS VIEW
C1-1691 S SAN JOSE DR - REVISED 2_V1_DTM COMMENTS.PDF DOCUMENTS VIEW
CHAPTER 25 RESIDENTIAL DRIVEWAY LAYOUT STDDTL-206.PDF DOCUMENTS VIEW