Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2025 | COT - RSEL - Electrical Underground | Not Ready | 7.17.25 Not ready |
|
| 08/04/2025 | COT - RSEL - Electrical Underground | Re-inspection required | 8-4-25: notes from 7-17-25 indicate not ready. Provide written documentation that underground electric was done per plans and meets the 2018 IRC requirements. Submit to the city for review and approval. | |
| 08/15/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 08/15/2025 | COT - RSEL - Electrical Underground | Re-inspection required (with fee) | 8-15-25: hot copper line at water heaters not wrapped with R-3 insulation, cleanouts not tightened, and replace receptacle metal covers to a bubble covers. Have plans on site to verify electrical underground- if you missed the required underground electrical inspection then a letter must be submitted to the city for review/approval indicating that it was done per plans and meets the 2018 IRC. |