Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2025 | COT - RSPL - Plumbing Final | Not Ready | 7.17.25 Not ready |
|
| 08/04/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant. | |
| 08/15/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/15/2025 | COT - RSPL - Plumbing Final | Re-inspection required (with fee) | 8-15-25: hot copper line at water heaters not wrapped with R-3 insulation, cleanouts not tightened, and replace receptacle metal covers to a bubble covers. Have plans on site to verify electrical underground- if you missed the required underground electrical inspection then a letter must be submitted to the city for review/approval indicating that it was done per plans and meets the 2018 IRC. |