Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
07/17/2025 RSBU - Building Final  Not Ready 7.17.25
Not ready
08/04/2025 RSBU - Building Final  Re-inspection required 8-4-25: exterior receptacle covers underneath main panel must be bubble wrap type or remove altogether and cover using a knockout plug, insulate hot copper line at water heaters with a minimum of R3 insulation, cleanouts not tightened/secured, and exterior railing noncompliant.
08/15/2025 RSBU - Building Final  Passed
08/15/2025 RSBU - Building Final  Re-inspection required (with fee) 8-15-25: hot copper line at water heaters not wrapped with R-3 insulation, cleanouts not tightened, and replace receptacle metal covers to a bubble covers. Have plans on site to verify electrical underground- if you missed the required underground electrical inspection then a letter must be submitted to the city for review/approval indicating that it was done per plans and meets the 2018 IRC.