Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/02/2025 ENGR Engineering Final Partial Pass Contractor and poor was form at this present time. They have not formed the ramp yet according to the contractor he’s going to put a Landi in the middle of the ramp area so he does not exceed the 8%.
07/17/2025 ENGR Engineering Final Failed Sidewalk leading to the front door is noncompliant. It exceeds the 5% running slope on all three units.
08/04/2025 ENGR Engineering Final Failed Railing contractor installed is not per city standards noncompliant
08/15/2025 ENGR Engineering Final Passed All previous items have been corrected