Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor and poor was form at this present time. They have not formed the ramp yet according to the contractor he’s going to put a Landi in the middle of the ramp area so he does not exceed the 8%. |
| 07/17/2025 |
ENGR Engineering Final
|
|
Failed |
Sidewalk leading to the front door is noncompliant. It exceeds the 5% running slope on all three units. |
| 08/04/2025 |
ENGR Engineering Final
|
|
Failed |
Railing contractor installed is not per city standards noncompliant |
| 08/15/2025 |
ENGR Engineering Final
|
|
Passed |
All previous items have been corrected |