Permit: TC-MDP-0326-00168
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
9593 E WYNALDA DR
Address NEW:
9593 E WYNALDA DR
Apply Date:
03/25/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
Permit Reviews
Permit Number - TC-MDP-0326-00168
Permit Status: Inspections
Permit Description: Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2026 | ADMINISTRATIVE v.1 | 04/10/2026 | REQUIRES RESUBMIT |
| 06/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2026 | APPROVED |
| 03/31/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0326-00168
Permit Status: Inspections
Permit Description: Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/13/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 04/03/2026 | Post-Installed Anchor Inspection Report is required. |
| 04/20/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Conditions
Permit Number - TC-MDP-0326-00168
Permit Status: Inspections
Permit Description: Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
| Date | Description | Comments |
|---|---|---|
| 04/03/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/13/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/03/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 03/13/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0326-00168
Permite Description: Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 07/07/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/04/2026 | RSBU - Building Final | N/A | Re-inspection required | 8.4.26 1. Missing k.o. Seal at the bottom of service panel. 2. Paint all exterior plastics 3. Kitchen island cannot have receptacles on the sides only. Pop up surface mounts are allowed. 4. HVAC condenser needs to be on GFCI breaker. 5. Dryer must be GFCI protected 6. EV receptacle must be GFCI protected 7. Install proper EV receptacle 8. Microwave must be GFCI protected |
| 09/04/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 8.4.26 1. Missing k.o. Seal at the bottom of service panel. 2. Paint all exterior plastics 3. Kitchen island cannot have receptacles on the sides only. Pop up surface mounts are allowed. 4. HVAC condenser needs to be on GFCI breaker. 5. Dryer must be GFCI protected 6. EV receptacle must be GFCI protected 7. Install proper EV receptacle 8. Microwave must be GFCI protected |
| 09/04/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 8.4.26 1. Missing k.o. Seal at the bottom of service panel. 2. Paint all exterior plastics 3. Kitchen island cannot have receptacles on the sides only. Pop up surface mounts are allowed. 4. HVAC condenser needs to be on GFCI breaker. 5. Dryer must be GFCI protected 6. EV receptacle must be GFCI protected 7. Install proper EV receptacle 8. Microwave must be GFCI protected |
| 09/09/2026 | ENGR Engineering Final | N/A | Not Ready | Conditions that need to be satisfied on permit are not satisfied prior to final inspection . |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0326-00168
Permit Description: Mirador Point 2037-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00090)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2026 | COT - RSPL - Yard Water Line | Passed | 5.14.26 Approved - backfill and proceed |
|
| 05/14/2026 | COT - RSPL - Rough Soil | Passed | ||
| 05/14/2026 | COT - RSPL - Sewer | Passed | 5.14.26 Approved - backfill and proceed |
|
| 06/15/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/15/2026 | COT - RSBU - Preslab | Passed | ||
| 06/15/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/15/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 06/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/24/2026 | COT - RSBU - Roof Nailing | Passed | corrected | |
| 07/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/07/2026 | BULD - Electrical Clearance | Passed | 7-7-2026 ECO TEP Clearance approved. | |
| 07/16/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/04/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 09/04/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/04/2026 | RSBU - Building Progress | Passed | ||
| 09/11/2026 | COT - RSEL - Electrical Final | Passed | 9-11-26 all corrections have been made. Also blanks are installed at kitchen island for future pop-up power | |
| 09/11/2026 | COT - RSME - Mechanical Final | Passed | 9-11-26 all corrections have been made. Also blanks are installed at kitchen island for future pop-up power |