Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2026 | COT - RSBU - Excavation/Rebar/Zoning | Canceled | ||
| 06/04/2026 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | Inspection missed. Please provide the following Post tension report Compaction report Termite report 2 pockets at each corner exposing footer/slab (8 total) Note: inspections cannot proceed until these items are handled and rebar/preslab inspections are passed |
|
| 06/09/2026 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 6/9/26: trades shall not begin any work until pre-slab inspection/foundation inspection has been addressed, footings shall be exposed to verify depth and width, per previous notes, studs shall make full contact with top and bottom plate (throughout), Masa clips improperly installed (7 nails minimum to replace 1/2" anchor bolt), fasteners at sheathing shall not penetrate more than 1/8", anchor bolts shall be installed in the middle third of the sill plate, anchor bolts shall not be closer than 7x the bolt diameter to the edge (3.5" minimum for 1/2" anchor bolts), sill plate at garage requires 2 anchor bolts with plate, cs14 strap required at garage opening per detail 308,fasteners at garage required at 3" o.c each way per deatail 308, SW at garage south east corner required to be 6' in length, ledger at back patio requires 4 (16D) nails at 24" o.c, anchor bolts shall be added where the number of nails cannot be confirmed on MASA clips throughout first floor, (1) nail required at G.T at stairs hanger, STOPPED INSPECTION (only walked first floor) MORE ITEMS MAY BE ADDED. |