Permit: TC-COM-1222-00264
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10001 S WILMOT RD
Address NEW:
10001 S WILMOT RD
Apply Date:
12/08/2022
Applicant:
Brad Davis
Description:
*RESTRICTED* New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Permit Reviews
Permit Number - TC-COM-1222-00264
Permit Status: Complete
Permit Description: *RESTRICTED* New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/10/2025 | APPROVED |
| 05/26/2023 | COMMERCIAL REVIEW - FULL v.3 | 06/13/2023 | APPROVED |
| 07/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2025 | APPROVED |
| 12/16/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/20/2023 | REQUIRES RESUBMIT |
| 03/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/20/2023 | REQUIRES RESUBMIT |
| 06/13/2023 | RESTAMP - COMMERCIAL v.1 | 06/13/2023 | APPROVED |
Conditions
Permit Number - TC-COM-1222-00264
Permit Status: Complete
Permit Description: *RESTRICTED* New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
| Date | Description | Comments |
|---|---|---|
| 12/16/2022 | Permit Application includes two listed addresses. 10001 S Wilmot Rd has several building numbers on address location. Correct address needs be assigned to the Permit Application and Plans prior to issuance. Please log into your TDC account and submit a request for an Address Change to remove an address or include a building number. IF plans don't have the correct address listed please submit approved plans without our City stamps with updated address on ALL plan sheets. Along with a Comment Response, stating that this is a re-stamp to resolve the addressing issue. | |
| 07/25/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/04/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 04/04/2023 | CONSTRUCTION OF CLASSROOM (832 SF) AND VIRTUAL TRAINING ROOM (1,700 SF) Designs must be submitted and approved prior to FINAL. | |
| 04/04/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/04/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 04/04/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 07/25/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00264
Permite Description: *RESTRICTED* New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 2/11/25: electrical underground from light pole north west to south west complete. Remove large rocks from trench. Shading required. |
| 12/20/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 12/20/24: partial pass for UFER at shooting platform. |
| 11/08/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 |
| 07/03/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 05/19/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 5-19-25, electrical,mechanical,plumbing above ceiling together with suspended ceiling framing in virtual classroom verified per plans. Okay to apply insulation at progress areas. |
| 02/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 2-10-25, top out at southwest shooting tower/column verified as per approved plans. |
| 07/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 7-25-25: not applicable |
| 04/21/2025 | COT - HCBU - Building Progress | N/A | Canceled | |
| COT - HCBU - Building Final | N/A | Not Ready | ||
| COT - FCON - Fire - Final | N/A | Not Ready | Will call back in for Hydrant Flush. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00264
Permit Description: *RESTRICTED* New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 07/03/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 07/03/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 07/03/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 07/03/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 07/03/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/03/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 07/25/2025 | COT - HCEL - Electrical Intermediate | Passed | 7-25-25: approved. | |
| 07/25/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 7-25-25: approved. | |
| 07/25/2025 | COT - HCPL - Rough Soil | Passed | 7-25-25: previously inspected and approved. | |
| 07/25/2025 | COT - HCME - Mechanical Intermediate | Passed | 7-25-25: approved. | |
| 07/25/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 7-25-25: previously inspected and approved. | |
| 07/25/2025 | COT - HCBU - Framing | Passed | 7-25-25: previously inspected and approved. | |
| 07/25/2025 | COT - HCBU - Preslab | Passed | 7-25-25: previously inspected and approved. | |
| 07/25/2025 | COT - HCPL - Plumbing Intermediate | Passed | 7-25-25: approved. | |
| 07/25/2025 | COT - HCME - Mechanical Progress | Passed | 7-25-25: approved. | |
| 07/25/2025 | COT - HCBU - Interior Shear Bracing | Passed | 7-25-25: previously inspected and approved. | |
| 07/25/2025 | COT - HCBU - Building Progress | Passed | 7-25-25: approved | |
| 08/21/2025 | COT - HCEL - Electrical Final | Passed | ||
| 08/21/2025 | COT - HCME - Mechanical Final | Passed | ||
| 08/21/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 10/17/2025 | ENGR Engineering Final | Passed | ||
| 08/28/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed outside of right of way | |
| 10/17/2025 | COT - HCBU - Building Final | Passed | ||
| 10/30/2025 | COT - FCON - Alarm - Final | Passed | ||
| 10/30/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 11/04/2025 | COT - FCON - Fire - Final | Passed |