Parcel: 30503004B


Addresses:

10001 S WILMOT RD


Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Permit Number - TC-COM-1222-00264

Inspection Description - COT - HCPL - Plumbing Progress 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/13/2025 COT - HCPL - Plumbing Progress  Partial Pass New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/4/24: canceled

Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve.
2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024
1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill.
01/13/2025 COT - HCPL - Plumbing Progress  Partial Pass New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/4/24: canceled

Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve.
2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024
1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill.
1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill.
01/28/2025 COT - HCPL - Plumbing Progress  Partial Pass New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/4/24: canceled

Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve.
2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024
1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill.
1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill.
1/28/25: gas pressure test under sidewalk passed. Ok to proceed
01/30/2025 COT - HCPL - Plumbing Progress  Partial Pass New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/4/24: canceled

Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve.
2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024
1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill.
1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill.
1/28/25: gas pressure test under sidewalk passed. Ok to proceed
1/30/25: plumbing underground complete ok to proceed
03/20/2025 COT - HCPL - Plumbing Progress  Not Ready 3-20-25, not ready.
03/24/2025 COT - HCPL - Plumbing Progress  Not Ready 3-24-25, not ready-contractor will reschedule.
03/25/2025 COT - HCPL - Plumbing Progress  Partial Pass 3-25-25, floor drain to be tested at later date-okay to pour concrete.
07/03/2025 COT - HCPL - Plumbing Progress  Passed
10/15/2024 COT - HCPL - Plumbing Progress  Partial Pass New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/04/2024 COT - HCPL - Plumbing Progress  Canceled New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024
11/4/24: canceled
11/08/2024 COT - HCPL - Plumbing Progress  Partial Pass Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve.
2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024