Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Progress
Permit Number - TC-COM-1222-00264
Inspection Description - COT - HCPL - Plumbing Progress
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | COT - HCPL - Plumbing Progress | Partial Pass | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 11/4/24: canceled Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill. |
|
| 01/13/2025 | COT - HCPL - Plumbing Progress | Partial Pass | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 11/4/24: canceled Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill. 1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill. |
|
| 01/28/2025 | COT - HCPL - Plumbing Progress | Partial Pass | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 11/4/24: canceled Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill. 1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill. 1/28/25: gas pressure test under sidewalk passed. Ok to proceed |
|
| 01/30/2025 | COT - HCPL - Plumbing Progress | Partial Pass | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 11/4/24: canceled Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 1/13/25:plumbing underground at class room not under test, 2" Domestic water line at west tie in at building passed and under pressure pending tie in at back-flow preventer. Tracer wire required at 2" Domestic water line prior to backfill. 1/13/25: plumbing underground at classroom passed. Ok to proceed with backfill. 1/28/25: gas pressure test under sidewalk passed. Ok to proceed 1/30/25: plumbing underground complete ok to proceed |
|
| 03/20/2025 | COT - HCPL - Plumbing Progress | Not Ready | 3-20-25, not ready. | |
| 03/24/2025 | COT - HCPL - Plumbing Progress | Not Ready | 3-24-25, not ready-contractor will reschedule. | |
| 03/25/2025 | COT - HCPL - Plumbing Progress | Partial Pass | 3-25-25, floor drain to be tested at later date-okay to pour concrete. | |
| 07/03/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 10/15/2024 | COT - HCPL - Plumbing Progress | Partial Pass | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 | |
| 11/04/2024 | COT - HCPL - Plumbing Progress | Canceled | New HCS connection. Approximately 120’ of 4” Sewer line. Pending 5’ to building. Key notes 17 and 11. Okay to back fill progress areas. Shading required. 10/15/2024 11/4/24: canceled |
|
| 11/08/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Fire line 4” at 4 1/2’ - 6 1/2’. Tracer wire in place to valve. 2” domestic line on test. 6’ away from building. Okay to backfill progress areas. Shading required. 11/8/2024 |