Permit: TC-COM-1124-02266
Permit Details
Apply Date:
11/27/2024
Applicant:
Dennis Caldwell
Description:
OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. TOTAL AREA OF REMODELED TENANT SPACE IS 1,546 SF. 2 OVERHEAD DOORS POSITIONED AT NEW OPENINGS FOR NEW TRUCK DOCKS. 2 ADDITIONAL OVERHEAD DOORS IN NEW OPENINGS FOR ACCESS. PLUMBING AND MECHANICAL TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Permit Reviews
Permit Number - TC-COM-1124-02266
Permit Status: Complete
Permit Description: OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. TOTAL AREA OF REMODELED TENANT SPACE IS 1,546 SF. 2 OVERHEAD DOORS POSITIONED AT NEW OPENINGS FOR NEW TRUCK DOCKS. 2 ADDITIONAL OVERHEAD DOORS IN NEW OPENINGS FOR ACCESS. PLUMBING AND MECHANICAL TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2025 | APPROVED |
| 01/13/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 01/29/2025 | REQUIRES RESUBMIT |
| 09/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2025 | APPROVED |
| 02/27/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 03/17/2025 | APPROVED |
| 03/17/2025 | RESTAMP - COMMERCIAL v.1 | 03/20/2025 | APPROVED |
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/08/2025 | APPROVED |
| 12/05/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 12/23/2024 | REQUIRES RESUBMIT |
| 08/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02266
Permit Status: Complete
Permit Description: OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. TOTAL AREA OF REMODELED TENANT SPACE IS 1,546 SF. 2 OVERHEAD DOORS POSITIONED AT NEW OPENINGS FOR NEW TRUCK DOCKS. 2 ADDITIONAL OVERHEAD DOORS IN NEW OPENINGS FOR ACCESS. PLUMBING AND MECHANICAL TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
| Date | Description | Comments |
|---|---|---|
| 12/12/2024 | AIR BALANCING REPORT IS REQUIRED FOR RTU-4 ONLY. | |
| 12/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/14/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/24/2025 | SPECIAL INSPECTION FOR EPOXY INSTALLATION OF ALL BOLTS AND/OR REINFORCING BARS IS REQUIRED. | |
| 01/13/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/24/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 01/24/2025 | SPECIAL INSPECTION FOR STRUCTURAL FIELD AND SHOP WELDING IS REQUIRED. | |
| 01/27/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02266
Permite Description: OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. TOTAL AREA OF REMODELED TENANT SPACE IS 1,546 SF. 2 OVERHEAD DOORS POSITIONED AT NEW OPENINGS FOR NEW TRUCK DOCKS. 2 ADDITIONAL OVERHEAD DOORS IN NEW OPENINGS FOR ACCESS. PLUMBING AND MECHANICAL TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 7-16-25: not applicable |
| 08/06/2025 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Applicable | 8-6-25: not applicable |
| 08/07/2025 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | |
| COT - FCON - Fire - Final | N/A | Not Ready | Need knox box on all buildings. Also need a knox pad lock for the gates in parking lot. Need to mount all fire extinguishers. The sprinkler coverage needs to be fixed @2701 | |
| COT - FCON - Sprinkler - Final | N/A | Not Ready | Need to fix coverage near the east roll up doors. Two heads to close together and there is wood brackets blocking coverage. | |
| 07/07/2025 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | 7.7.25: Missing receptacle at office 1. Revision needed for missing receptacle at floor to ceiling window area in office. Electrical above ceiling verified per plans-okay to continue with construction at progress areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1124-02266
Permit Description: OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. TOTAL AREA OF REMODELED TENANT SPACE IS 1,546 SF. 2 OVERHEAD DOORS POSITIONED AT NEW OPENINGS FOR NEW TRUCK DOCKS. 2 ADDITIONAL OVERHEAD DOORS IN NEW OPENINGS FOR ACCESS. PLUMBING AND MECHANICAL TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - LCPL - Rough Soil | Passed | 4-29-25, underground plumbing per plans and under test. Okay to backfill. | |
| 07/07/2025 | COT - LCPL - Plumbing Intermediate | Passed | 7-7-25: plumbing intermediate approved. | |
| 07/15/2025 | COT - LCBU - Framing | Passed | 7-15-25: approved. | |
| 08/06/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/07/2025 | COT - LCBU - Preslab | Passed | ||
| 08/07/2025 | COT - LCEL - Electrical Underground | Passed | Secondary lines from transformer to new meter bank location. X2 floor boxes. Okay to backfill progress areas. 8/7/2025 |
|
| 08/27/2025 | ENGR Engineering Final | Passed | ||
| 08/27/2025 | COT - LCEL - Grounding/Bonding | Passed | 8-27-25: approved. | |
| 09/02/2025 | COT - FCON - Fire - Final | Passed | ||
| 09/02/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/02/2025 | COT - LCEL - Electrical Final | Passed | 9-2-25: electrical final approved. | |
| 09/02/2025 | COT - LCME - Mechanical Final | Passed | 9-2-25: mechanical final approved. | |
| 09/02/2025 | COT - LCPL - Plumbing Final | Passed | 9-2-25: plumbing final approved. | |
| 09/02/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - LCME - Mechanical Intermediate | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - LCEL - Electrical Intermediate | Passed | 9-2-25: approved. | |
| 09/09/2025 | COT - LCBU - Building Final | Passed | 9-9-25: Building final approved. Note: see pending conditions. |