Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1122-00044
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
10041 E OLD VAIL RD
Address NEW:
10041 E OLD VAIL RD
Apply Date:
11/03/2022
Applicant:
Jake Hughes
Description:
New Commercial Storage Building
Permit Reviews
Permit Number - TC-COM-1122-00044
Permit Status: In review
Permit Description: New Commercial Storage Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2025 | APPROVED |
| 03/18/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/18/2024 | APPROVED |
| 11/14/2022 | COMMERCIAL REVIEW - FULL v.1 | 10/18/2023 | REQUIRES RESUBMIT |
| 05/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/15/2025 | APPROVED |
| 04/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/22/2025 | REQUIRES RESUBMIT |
| 07/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/16/2024 | REQUIRES RESUBMIT |
| 08/16/2024 | COMMERCIAL REVIEW - FULL v.2 | 09/05/2024 | REQUIRES RESUBMIT |
| 10/04/2024 | COMMERCIAL REVIEW - FULL v.3 | 10/16/2024 | APPROVED |
| 06/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2025 | APPROVED |
| 11/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2025 | REQUIRES RESUBMIT |
| 12/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/01/2025 | REQUIRES RESUBMIT |
| 12/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | N/A | IN REVIEW |
| 03/05/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/02/2025 | APPROVED |
| 10/16/2024 | RESTAMP - COMMERCIAL v.1 | 10/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1122-00044
Permit Status: In review
Permit Description: New Commercial Storage Building
Total Outstanding Activity Conditions - 15
| Date | Name |
|---|---|
| 06/15/2025 | Elevator Designs must be submitted and approved prior to ... |
| 06/15/2025 | Fire Stopping Designs (penetration and joints) must be submitted and approved prior to installation. |
| 06/15/2025 | Prefabricated Canopy Designs must be submitted and approved prior to fabrication. |
| 10/22/2024 | COMMISSIONING REPORT IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/22/2024 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 10/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 10/22/2024 | Masonry Inspection Report submittal review is required. |
| 10/22/2024 | Post-Installed Anchor Inspection Report is required. |
| 10/22/2024 | SPECIAL INSPECTION FOR EFIS IS REQUIRED |
| 10/22/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Conditions
Permit Number - TC-COM-1122-00044
Permit Status: In review
Permit Description: New Commercial Storage Building
| Date | Description | Comments |
|---|---|---|
| 09/26/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/22/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 10/22/2024 | Metal stud designs must be submitted and approved prior to final | |
| 10/22/2024 | Store front and window system designs must be submitted and approved prior to final | |
| 07/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 08/20/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 10/22/2024 | Stair Designs must be submitted and approved prior to... | |
| 10/22/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-1122-00044
Permite Description: New Commercial Storage Building
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 11-13-24, reinforcement per approved plans on elevator shaft walls (4), okay to grout. |
| 11/06/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 11-6-24: reinforcement per plan 2nd lift at 96" A. F. F. at NE stairwell. NE stairwell being grouted. |
| 12/30/2024 | COT - HCBU - Framing | N/A | Partial Pass | 12/30/24: PARTIAL PASS--2nd floor wall framing completed, worker's are screwing off the 3rd floor decking off. |
| 02/05/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 2-5-25, intermediate on 1st floor office area, restrooms at office area, and restroom on 2nd floor on southeast quad. Partial pass on progress areas-okay for wall covering. |
| 02/05/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 2-5-25, exterior sheathing/nailing on exterior west wall verified as per approved plans. Okay to continue construction on progress areas. |
| 10/22/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 2/0 Ufer for SES. 2 Ground rods with # 6 ground to SES. 4” conduit for telephone (utilities) schedule 40. Remainder of x9 1” stubbing up into wall in I.T room. Okay to backfill progress areas. 10/22/2024 |
| 02/06/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 2-6-25, plumbing intermediate inspection for office and bathrooms at office on 1st floor together with bathroom on 2nd floor verified as per approved plans. Okay to continue construction at progress areas. |
| 06/17/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Not Ready | Missing deadfront at panel 3rd floor. Add labeling to all panels along with printed panel schedules. Add cover plates to blanks. Label all j boxes. Open j boxes throughout need to be made up and labeled. Mc cable hanging for outdoor signage. Stopped inspection other items may apply. 6/17/2025 |
| 02/28/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 2-6-25, office and bathrooms at office on 1st floor together with bathroom on 2nd floor verified as per approved plans. Okay to continue construction at progress areas. 2/28/25:electrical wall cover up in both elevator machine rooms partial pass. |
| 07/10/2025 | ENGR Engineering Final | N/A | Partial Pass | Okay fot Level 4 TCO |
| 07/09/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | ok level 4 tco just need the elevator to pass state inspection. |
| 07/10/2025 | COT - HCBU - Building Final | N/A | Partial Pass | 7/10/25: OK FOR LEVEL 4 TCO |
| 06/17/2025 | COT - HCEL - Outdoor Lighting | N/A | Not Ready | Missing deadfront at panel 3rd floor. Add labeling to all panels along with printed panel schedules. Add cover plates to blanks. Label all j boxes. Open j boxes throughout need to be made up and labeled. Mc cable hanging for outdoor signage. Stopped inspection other items may apply. 6/17/2025 |
| 06/18/2025 | COT - HCPL - Yard Water Line | N/A | Re-inspection required | There is no history on water line inspection. Need to verify size, depth and tracer wire. 6/18/2025 |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-1122-00044
Permit Description: New Commercial Storage Building
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Forms are set for 2 elevator pits and 2 stairwell footings, rebar is properly installed per plan and supported off of soil. Okay to proceed with pouring concrete for footings. | |
| 10/11/2024 | COT - HCPL - Rough Soil | Passed | Underground plumbing is complete and under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 10/22/2024 | COT - BULD - SWG Clearance | Passed | ||
| 11/25/2024 | COT - HCBU - Interior Shear Bracing | Passed | 11-25-24: CMU block and rebar reinforcement are properly installed per plan on both stairways to 26'. Okay to grout. | |
| 12/13/2024 | COT - HCBU - Masonry Pregrout | Passed | 12-13-24: elevator shaft 1 and 2 are okay to grout. | |
| 01/06/2025 | COT - HCBU - Preslab | Passed | 1/6/23: #5 rebar mat for 3rd floor decking is properly tied and supported off of metal decking as per plans. Okay to pour concrete for 3rd floor decking. | |
| 01/24/2025 | COT - HCBU - Framing | Passed | 1/24/25: Roof decking is properly secured to roof framing. Okay to proceed with roofing application. | |
| 02/21/2025 | COT - HCPL - Sewer | Passed | Building underground plumbing is connected to main sewer line with green tracer wire installed. Okay to shade pipe and backfill trench. | |
| 05/15/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 05/15/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 05/15/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 05/15/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 05/28/2025 | COT - HCEL - Grounding/Bonding | Passed | 5-28-25, verified grounding/bonding as per plans for main distribution -Type 3R Enclosure. | |
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5-28-25, main distribution -Type 3R Enclosure approved and is okay to be energized. ECO clearance issued to TEP. | |
| 06/18/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/18/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 06/26/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 6/26/2025 all corrections have been made. | |
| 06/26/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 06/26/2025 | COT - HCEL - Electrical Final | Passed | 6/26/2025 all corrections have been made. Approved. | |
| 06/30/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 06/30/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 06/30/2025 | COT - HCME - Mechanical Final | Passed | ||
| 06/30/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 07/08/2025 | COT - LCBU - Building Final | Passed | 7-8-25: building final approved. Note: see pending conditions. |
|
| 07/10/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 07/10/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 07/10/2025 | COT - HCPL - Yard Water Line | Passed |