| 01/06/2025 | COT - HCBU - Preslab | Passed | 1/6/23: #5 rebar mat for 3rd floor decking is properly tied and supported off of metal decking as per plans. Okay to pour concrete for 3rd floor decking. | |
| 10/18/2024 | COT - HCBU - Preslab | Partial Pass | Concrete forms are set for walls on both elevator pits and east, south, west and partial of north perimeter walls. Okay to pour concrete. | |
| 10/24/2024 | COT - HCBU - Preslab | Partial Pass | Concrete forms are set for walls on both elevator pits and east, south, west and partial of north perimeter walls. Okay to pour concrete. ' 10/24/24: reinforcement per plan at GL 1-7/A-K at slab |
|
| 10/25/2024 | COT - HCBU - Preslab | Passed | 10/25/24: Reinforcement in place in center section 6.6 to 10.2 a to k. Okay to pour concrete. | |
| 12/19/2024 | COT - HCBU - Preslab | Partial Pass | 12-19-24, #5 rebar for mat slab on decking verified at 12" o.c-okay to pour concrete. Also, entire 2nd floor decking reinspected.All required noted corrections from previous inspection were made at 12" o.c on each supporting member together with 6" o.c for interior bearing decking. Okay to proceed with construction at inspected areas. 1st floor framing not inspected. |