Permit: TC-COM-1024-02095
Permit Details
Apply Date:
10/31/2024
Applicant:
Dennis Caldwell
Description:
ELVIRA BUILDING 2711 TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING BUILDING. +/-1556 SF OF OFFICE SPACE AND THE REST AS OPEN WAREHOUSE SPACE. 5 OVERHEAD DOORS POSITIONED AT EXISTING OPENINGS FOR NEW TRUCK DOCKS. MECHANICAL AND PLUMBING TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Permit Reviews
Permit Number - TC-COM-1024-02095
Permit Status: Complete
Permit Description: ELVIRA BUILDING 2711 TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING BUILDING. +/-1556 SF OF OFFICE SPACE AND THE REST AS OPEN WAREHOUSE SPACE. 5 OVERHEAD DOORS POSITIONED AT EXISTING OPENINGS FOR NEW TRUCK DOCKS. MECHANICAL AND PLUMBING TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/02/2025 | APPROVED |
| 06/12/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 06/13/2025 | APPROVED |
| 09/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 09/09/2025 | APPROVED |
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/08/2025 | REQUIRES RESUBMIT |
| 03/03/2025 | RESTAMP - COMMERCIAL v.1 | 03/10/2025 | APPROVED |
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/26/2024 | REQUIRES RESUBMIT |
| 06/03/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/09/2025 | REQUIRES RESUBMIT |
| 02/10/2025 | COMMERCIAL REVIEW - FULL v.3 | 02/25/2025 | REQUIRES RESUBMIT |
| 09/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2025 | REQUIRES RESUBMIT |
| 08/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/25/2025 | APPROVED |
| 01/13/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/04/2025 | REQUIRES RESUBMIT |
| 08/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/18/2025 | REQUIRES RESUBMIT |
| 02/27/2025 | COMMERCIAL REVIEW - FULL v.4 | 03/03/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1024-02095
Permit Status: Complete
Permit Description: ELVIRA BUILDING 2711 TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING BUILDING. +/-1556 SF OF OFFICE SPACE AND THE REST AS OPEN WAREHOUSE SPACE. 5 OVERHEAD DOORS POSITIONED AT EXISTING OPENINGS FOR NEW TRUCK DOCKS. MECHANICAL AND PLUMBING TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
| Date | Description | Comments |
|---|---|---|
| 02/28/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/28/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 10/31/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/28/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/13/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/28/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 10/31/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 02/28/2025 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02095
Permite Description: ELVIRA BUILDING 2711 TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING BUILDING. +/-1556 SF OF OFFICE SPACE AND THE REST AS OPEN WAREHOUSE SPACE. 5 OVERHEAD DOORS POSITIONED AT EXISTING OPENINGS FOR NEW TRUCK DOCKS. MECHANICAL AND PLUMBING TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 7-15-25: not applicable |
| 08/27/2025 | ENGR Engineering Final | N/A | Not Ready | Fire exit stairs next to loading dock needs to be repared. Loading dock needs/loading unloading only sign noted in keynote 29. |
| 04/25/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 4/9/25: ok to one-side. In wall inspection required when all inspections shall wall work is complete 4/25/25: grommets required at PVC running through metal studs, support required on copper domestic water in wall west wall of bathroom, seal off all joints at hard duct, Mechanical not ready, electrical in wall per approved plan. |
| 04/25/2025 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 4/9/25: ok to one-side. In wall inspection required when all inspections shall wall work is complete 4/25/25: grommets required at PVC running through metal studs, support required on copper domestic water in wall west wall of bathroom, seal off all joints at hard duct, Mechanical not ready, electrical in wall per approved plan. |
| 04/25/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 4/9/25: ok to one-side. In wall inspection required when all inspections shall wall work is complete 4/25/25: grommets required at PVC running through metal studs, support required on copper domestic water in wall west wall of bathroom, seal off all joints at hard duct, Mechanical not ready, electrical in wall per approved plan. |
| 09/09/2025 | COT - HCBU - CofO | N/A | Partial Pass | 9-9-25: corrections made. Okay for a Level 4 TCO-see pending conditions. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02095
Permit Description: ELVIRA BUILDING 2711 TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING BUILDING. +/-1556 SF OF OFFICE SPACE AND THE REST AS OPEN WAREHOUSE SPACE. 5 OVERHEAD DOORS POSITIONED AT EXISTING OPENINGS FOR NEW TRUCK DOCKS. MECHANICAL AND PLUMBING TO BE REWORKED TO FIT NEW PARTITION LAYOUT. NEW ELECTRICAL WORK TO INCLUDE POWER AND LIGHTING THROUGHOUT BUILDING.
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | BULD - Electrical Clearance | Passed | 7-16-25: okay to energize-INCR issued to TEP. | |
| 08/08/2025 | COT - HCBU - Framing | Passed | 8-8-25: approved | |
| 08/12/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/27/2025 | COT - FCON - Alarm - Final | Passed | ||
| 09/10/2025 | COT - FCON - Fire - Final | Passed | Need knox box and riser room sign needs to be red with white letters. 9/10/25 Completed per Will Motto | |
| 08/27/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/27/2025 | COT - HCBU - Sustainability | Passed | 8-27-25: approved. | |
| 09/02/2025 | COT - HCBU - Building Above Ceiling | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCBU - Building Progress | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCEL - Electrical Final | Passed | 9-2-25: electrical final approved. | |
| 09/02/2025 | COT - HCEL - Electrical Progress | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCEL - Grounding/Bonding | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCME - Mechanical Final | Passed | 9-2-25: mechanical final approved. | |
| 09/02/2025 | COT - HCME - Mechanical Progress | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCME - Venting | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | 9-2-25: approved. | |
| 09/02/2025 | COT - HCPL - Plumbing Final | Passed | 9-2-25: plumbing final approved. | |
| 09/02/2025 | COT - HCPL - Plumbing Progress | Passed | 9-2-25: approved. | |
| 09/09/2025 | COT - HCBU - Building Final | Passed | 9-9-25: Building final approved. Note: see pending conditions. |