Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1024-02056
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
5300 E LOS REALES RD BLDG 6
Address NEW:
5300 E LOS REALES RD BLDG 6
Apply Date:
10/24/2024
Applicant:
Architecture & Engineering City of Tucson
Description:
CIP Project - LRSC pre-fab metal bldg
Permit Reviews
Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2025 | APPROVED |
| 11/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/28/2025 | APPROVED |
| 10/28/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 11/12/2024 | APPROVED |
| 12/23/2024 | RESTAMP - COMMERCIAL v.1 | 12/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 01/06/2025 | SPECIAL INSPECTION FOR POST-INSTALLED ANCHORS REQUIRED |
| 10/28/2024 | SPECIAL INSPECTION FOR CONCRETE (Placement of Cast-in-Place Anchor Bolts) IS REQUIRED. |
| 10/28/2024 | Post-Installed Anchor Inspection Report is required. |
| 10/28/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 10/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 10/28/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED OR PROVIDE FABRICATOR'S CERTIFICATE OF COMPLIANCE |
Conditions
Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
| Date | Description | Comments |
|---|---|---|
| 10/28/2024 | Address corrected on permit to Building 6 Per Applicant upload. | |
| 10/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/28/2024 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
| 01/02/2025 | PRE-FABRICATED METAL BUILDING DESIGN MUST BE SUBMITTED AND APPROVED BY BUILDING SAFETY PRIOR TO FINAL INSPECTIONS | |
| 01/06/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/28/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1024-02056
Permite Description: CIP Project - LRSC pre-fab metal bldg
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | COT - LCBU - Building Final | N/A | Not Ready | |
| 04/10/2025 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 02/28/2025 | COT - LCPL - Plumbing Final | N/A | Partial Pass | 2-25-25, underground plumbing verified as per approved plans. Okay to backfill with shading. 2/28/25: pre-con for sewer |
| 06/04/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 6/4/25: partial pass for UFER |
| 01/23/2025 | BULD - Electrical Clearance | N/A | Not Ready | |
| 09/26/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 9-26-25: verified trench depth for 2- 4" schedule 40 electrical primary conduits from “J2” equipment, west to existing TEP manhole. Okay to backfill approximately 160' of trench. |
| 10/09/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
| 12/02/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 12-2-25: in wall electrical at room's 101, 102, 103 verified per plans. Okay to drywall progress areas. Note: An RFI will possibly be submitted in the near future showing the mini split condensation draining into mop sink. |
| 12/03/2025 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 12-3-25: verified domestic for shell under test at 95psi together with underground plumbing for 10000 gallon precast concrete tank on northwest end of building. Okay to backfill approximately 70' open trench using shading materials. |