Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
10/24/2024
Applicant:
Architecture & Engineering City of Tucson
Description:
CIP Project - LRSC pre-fab metal bldg

Permit Reviews

Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
Start Date Submittal Complete Date Status  
01/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2025 APPROVED Review Details
11/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/28/2025 APPROVED Review Details
10/28/2024 COMMERCIAL REVIEW - LIMITED v.1 11/12/2024 APPROVED Review Details
12/23/2024 RESTAMP - COMMERCIAL v.1 12/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
Total Outstanding Activity Conditions - 6
Date Name
01/06/2025 SPECIAL INSPECTION FOR POST-INSTALLED ANCHORS REQUIRED
10/28/2024 SPECIAL INSPECTION FOR CONCRETE (Placement of Cast-in-Place Anchor Bolts) IS REQUIRED.
10/28/2024 Post-Installed Anchor Inspection Report is required.
10/28/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/28/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED OR PROVIDE FABRICATOR'S CERTIFICATE OF COMPLIANCE

Conditions

Permit Number - TC-COM-1024-02056
Permit Status: Issued
Permit Description: CIP Project - LRSC pre-fab metal bldg
Date Description Comments
10/28/2024 Address corrected on permit to Building 6 Per Applicant upload.
10/28/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/28/2024 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
01/02/2025 PRE-FABRICATED METAL BUILDING DESIGN MUST BE SUBMITTED AND APPROVED BY BUILDING SAFETY PRIOR TO FINAL INSPECTIONS
01/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/28/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-1024-02056
Permite Description: CIP Project - LRSC pre-fab metal bldg
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
04/10/2025 COT - LCBU - Building Final N/A Not Ready
04/10/2025 COT - LCEL - Electrical Final N/A Not Ready
02/28/2025 COT - LCPL - Plumbing Final N/A Partial Pass 2-25-25, underground plumbing verified as per approved plans. Okay to backfill with shading.
2/28/25: pre-con for sewer
06/04/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass 6/4/25: partial pass for UFER
01/23/2025 BULD - Electrical Clearance N/A Not Ready
09/26/2025 COT - HCEL - Electrical Underground N/A Partial Pass 9-26-25: verified trench depth for 2- 4" schedule 40 electrical primary conduits from “J2” equipment, west to existing TEP manhole. Okay to backfill approximately 160' of trench.
10/09/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass
12/02/2025 COT - LCEL - Electrical Intermediate N/A Partial Pass 12-2-25: in wall electrical at room's 101, 102, 103 verified per plans. Okay to drywall progress areas.
Note: An RFI will possibly be submitted in the near future showing the mini split condensation draining into mop sink.
12/03/2025 COT - LCPL - Plumbing Intermediate N/A Partial Pass 12-3-25: verified domestic for shell under test at 95psi together with underground plumbing for 10000 gallon precast concrete tank on northwest end of building. Okay to backfill approximately 70' open trench using shading materials.

Documents

File Name Document Type  
PEMB DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE ATEK STAMP 2024-12-6-2024-12-31_V1.PDF DOCUMENTS VIEW
CONS-722.03_BYFUSION_REV 4_24-1220_V1.PDF DOCUMENTS VIEW
123340 LOS REALES BYFUSION METAL BUILDING STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
230255 LRSC BYFUSION BUILDING GEOTECH RPT_V1.PDF DOCUMENTS VIEW
CONS-CIP-0424-00013 PLANS 9-24-24_V1.PDF DOCUMENTS VIEW