Permit: TC-COM-1024-02030
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4888 N STONE AV UNIT 120
Address NEW:
4888 N STONE AV UNIT 120
Apply Date:
10/22/2024
Applicant:
Arturo Nunez
Description:
Interior Fit Ups Unit 120 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
Permit Reviews
Permit Number - TC-COM-1024-02030
Permit Status: Complete
Permit Description: Interior Fit Ups Unit 120 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/30/2024 | RESTAMP - COMMERCIAL v.1 | 01/07/2025 | APPROVED |
| 10/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/19/2024 | REQUIRES RESUBMIT |
| 12/24/2024 | COMMERCIAL REVIEW - FULL v.3 | 12/30/2024 | APPROVED |
| 02/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | APPROVED |
| 12/05/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/20/2024 | REQUIRES RESUBMIT |
| 02/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/18/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1024-02030
Permit Status: Complete
Permit Description: Interior Fit Ups Unit 120 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
| Date | Description | Comments |
|---|---|---|
| 12/30/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/30/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 12/30/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 12/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 12/30/2024 | Masonry Inspection Report submittal review is required. | |
| 12/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/30/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02030
Permite Description: Interior Fit Ups Unit 120 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | |
| 06/18/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | |
| 11/03/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 12/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/30/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | 6-30-25: mechanical above ceiling on a total of 5 bathroom's located north side of 2nd floor verified per plans. Okay for hard lid at progress areas. |
| 10/27/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Electrical, Mechanical, Plumbing above ceiling in store room C17, offices and exam rooms at GL: 7 - 1, store room 2000, vestibule 2000. Ok to place ceiling tile in progress areas. |
| 08/12/2025 | COT - HCBU - Framing | N/A | Partial Pass | |
| 05/21/2025 | COT - HCBU - Preslab | N/A | Not Ready | |
| 10/31/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | |
| 04/16/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Grid line A.1-F columns 8-9 all underground plumbing on test okay to back fill progress areas. 4/16/2025 |
| 06/30/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | 6-30-25: plumbing above ceiling on a total of 5 bathroom's located north side of 2nd floor verified per plans. Okay for hard lid at progress areas. NOTE: insulate/wrap hot copper lines -will be verified at finals. |
| 05/30/2025 | COT - HCME - Mechanical Intermediate | N/A | Canceled | Canceled per contractor. 5/30/2025 |
| 12/16/2025 | COT - HCPL - Plumbing Final | N/A | Partial Pass | |
| 06/30/2025 | COT - HCBU - Building Above Ceiling | N/A | Not Ready | 6-30-25: this inspection will be verified at finals. |
| 12/18/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor is looking for TCO Level 1. Building Site is secured with temporary fencing around perimeter and portion of parking lot to the south and the loading dock area to the east. Construction material and equipment are secured behind this fence. West side entrance has clear vehicle access. Vehicles can safely access this driveway and unload furniture/equipment through this entryway. Okay for Level 1 TCO for Furniture/stocking but no public. |
| 12/19/2025 | COT - HCBU - Building Final | N/A | Not Ready | |
| 02/06/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Approved for level 2 TCO. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02030
Permit Description: Interior Fit Ups Unit 120 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | COT - HCPL - Rough Soil | Passed | ||
| 12/18/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/14/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 1st floor grids 1-8. Letter has been provided and built as to the typ lamp support detail per the strustructural enengineer. Okay to drop ceiling tiles. 1/14/2026 | |
| 01/14/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 1st floor grids 1-8. Letter has been provided and built as to the typ lamp support detail per the strustructural enengineer. Okay to drop ceiling tiles. 1/14/2026 | |
| 01/29/2026 | COT - HCBU - Framing | Passed | ||
| 01/29/2026 | COT - HCBU - Preslab | Passed | ||
| 01/29/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 01/29/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 01/29/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 01/29/2026 | COT - HCME - Mechanical Intermediate | Passed | ||
| 02/06/2026 | COT - FCON - Alarm - Final | Passed | ||
| 02/06/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/10/2026 | COT - HCME - Mechanical Final | Passed | ||
| 02/10/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 02/11/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 02/11/2026 | COT - HCEL - Electrical Final | Passed | ||
| 02/13/2026 | ENGR Engineering Final | Passed | ||
| 02/18/2026 | COT - HCBU - Building Final | Passed | 2/18/26: Building Final approved. Pending conditions | |
| 02/18/2026 | COT - FCON - Fire - Final | Passed |