Inspection Status: Passed

Inspection History: COT - HCBU - Framing

Date Description Inspector Results Comments
01/29/2026 COT - HCBU - Framing Passed
02/10/2025 COT - HCBU - Framing Partial Pass
05/30/2025 COT - HCBU - Framing Partial Pass 2nd floor. Grid A-D column lines 2-7. Framing and in wall electrical inspection approved okay to one side progress areas. 5/30/2025
06/03/2025 COT - HCBU - Framing Partial Pass Second floor, partial approval, grid lines D through G and 2 through OK to one side several kickers missing
06/13/2025 COT - HCBU - Framing Partial Pass
06/17/2025 COT - HCBU - Framing Partial Pass
07/15/2025 COT - HCBU - Framing Partial Pass
07/17/2025 COT - HCBU - Framing Not Ready
07/18/2025 COT - HCBU - Framing Partial Pass
07/25/2025 COT - HCBU - Framing Partial Pass 7/25/2025 First floor. Partial pass. Grid line 6-8 A-G. Okay to proceed progress areas.
08/08/2025 COT - HCBU - Framing Partial Pass
08/12/2025 COT - HCBU - Framing Partial Pass