Inspection Status: Passed

Inspection History: COT - HCME - Mechanical Above Ceiling

Date Description Inspector Results Comments
01/14/2026 COT - HCME - Mechanical Above Ceiling Passed 1st floor grids 1-8. Letter has been provided and built as to the typ lamp support detail per the strustructural enengineer. Okay to drop ceiling tiles. 1/14/2026
06/30/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 6-30-25: mechanical above ceiling on a total of 5 bathroom's located north side of 2nd floor verified per plans. Okay for hard lid at progress areas.
07/09/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 2302, 2303, 2323, 2005. Hard lid areas approved. Okay to proceed progress areas. 7/9/2025
07/23/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
08/08/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
08/14/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
08/19/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
09/02/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
09/25/2025 COT - HCME - Mechanical Above Ceiling Not Ready
10/15/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
11/07/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
11/13/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
12/02/2025 COT - HCME - Mechanical Above Ceiling Partial Pass
12/02/2025 COT - HCME - Mechanical Above Ceiling Passed
12/31/2025 COT - HCME - Mechanical Above Ceiling Partial Pass Level #1 South portion of structure; GL; 8 - 13. OK to set ceiling tiles.