Permit: TC-COM-0925-01709
Permit Details
Apply Date:
09/19/2025
Applicant:
Andrew Venne
Description:
Tenant Improvment
Permit Reviews
Permit Number - TC-COM-0925-01709
Permit Status: Complete
Permit Description: Tenant Improvment
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/25/2026 | APPROVED |
| 06/16/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2026 | APPROVED |
| 09/19/2025 | COMMERCIAL REVIEW - FULL v.1 | 10/21/2025 | APPROVED |
| 10/21/2025 | ADMINISTRATIVE v.1 | 10/21/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0925-01709
Permit Status: Complete
Permit Description: Tenant Improvment
| Date | Description | Comments |
|---|---|---|
| 10/09/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 10/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/19/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/09/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0925-01709
Permit Description: Tenant Improvment
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 02/25/2026 | COT - LCPL - Rough Soil | Passed | ||
| 03/25/2026 | COT - LCEL - Electrical Intermediate | Passed | 3-25-26: in wall electrical intermediates at warehouse & office areas approved. | |
| 05/05/2026 | COT - HCBU - Interior Shear Bracing | Passed | 5-5-26: all drywall screw inspections approved. | |
| 05/05/2026 | COT - HCPL - Plumbing Intermediate | Passed | 5-5-26: approved. | |
| 05/21/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 5-21-26: above ceiling electrical approved. | |
| 05/21/2026 | COT - LCME - Mechanical Intermediate | Passed | 5-21-26: tape any tears regardless of size on existing HVAC trunks. Mechanical intermediates approved but will check for corrections at building final. | |
| 06/16/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 06/16/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/16/2026 | COT - FCON - Alarm - Final | Passed | ||
| 06/17/2026 | COT - LCME - Mechanical Final | Passed | 6-17-26: mechanical final approved. | |
| 06/17/2026 | COT - LCPL - Plumbing Final | Passed | 6-17-26: plumbing final approved. | |
| 06/22/2026 | COT - LCEL - Electrical Final | Passed | 6-22-26: electrical final approved. | |
| 06/25/2026 | COT - LCBU - Building Final | Passed | 6-25-26: building final approved. Okay to apply for a C of O. | |
| 06/25/2026 | COT - LCBU - Framing | Passed | 6-25-26: RFI for framing has been submitted to the city-Framing approved. |