Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2850 E DREXEL RD
Address NEW:
2850 E DREXEL RD
Apply Date:
09/19/2025
Applicant:
Andrew Venne
Description:
Tenant Improvment

Permit Reviews

Permit Number - TC-COM-0925-01709
Permit Status: Complete
Permit Description: Tenant Improvment
Start Date Submittal Complete Date Status  
06/24/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/25/2026 APPROVED Review Details
06/16/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2026 APPROVED Review Details
09/19/2025 COMMERCIAL REVIEW - FULL v.1 10/21/2025 APPROVED Review Details
10/21/2025 ADMINISTRATIVE v.1 10/21/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0925-01709
Permit Status: Complete
Permit Description: Tenant Improvment
Date Description Comments
10/09/2025 AIR BALANCING REPORT IS REQUIRED.
10/21/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/19/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/09/2025 WATER STERILIZATION REPORT IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0925-01709
Permit Description: Tenant Improvment
Total Completed Inspections - 15
Date Description Inspector Results Comments
02/25/2026 PDSD Building Division Pre-Construction Meeting Passed
02/25/2026 COT - LCPL - Rough Soil Passed
03/25/2026 COT - LCEL - Electrical Intermediate Passed 3-25-26: in wall electrical intermediates at warehouse & office areas approved.
05/05/2026 COT - HCBU - Interior Shear Bracing Passed 5-5-26: all drywall screw inspections approved.
05/05/2026 COT - HCPL - Plumbing Intermediate Passed 5-5-26: approved.
05/21/2026 COT - LCEL - Electrical Above Ceiling Passed 5-21-26: above ceiling electrical approved.
05/21/2026 COT - LCME - Mechanical Intermediate Passed 5-21-26: tape any tears regardless of size on existing HVAC trunks. Mechanical intermediates approved but will check for corrections at building final.
06/16/2026 COT - FCON - Sprinkler - Final Passed
06/16/2026 COT - FCON - Fire - Final Passed
06/16/2026 COT - FCON - Alarm - Final Passed
06/17/2026 COT - LCME - Mechanical Final Passed 6-17-26: mechanical final approved.
06/17/2026 COT - LCPL - Plumbing Final Passed 6-17-26: plumbing final approved.
06/22/2026 COT - LCEL - Electrical Final Passed 6-22-26: electrical final approved.
06/25/2026 COT - LCBU - Building Final Passed 6-25-26: building final approved. Okay to apply for a C of O.
06/25/2026 COT - LCBU - Framing Passed 6-25-26: RFI for framing has been submitted to the city-Framing approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
CHANNELS ON TOP OF WALLS FOR STRUCTURAL SUPPORT LETTER STAMPED_V1.PDF DOCUMENTS VIEW
BALANCE REPORT_V1.PDF DOCUMENTS VIEW
WATER REPORT-2026-06-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
125221 CHAMBERLAIN GROUP UPDATES CALCULATION PACKAGE COPY_V1.PDF DOCUMENTS VIEW
25160 SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW
CONS-A-1 THRU E5.0 2850 E DREXEL REMODEL 09-16-25_V1.PDF DOCUMENTS VIEW