Inspection Status: Partial Pass
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2026 |
COT - LCBU - Framing |
|
Partial Pass |
2/25/26: Mechanical framing opening approved ok to proceed. |
| 03/11/2026 |
COT - LCBU - Framing |
|
Partial Pass |
3-11-26: interior metal framing at the 3 high walls verified per plans. Horizontal Bracing at 8' o.c. & with proper shot pin placement. Okay to continue with construction at progress areas. |
| 03/24/2026 |
COT - LCBU - Framing |
|
Partial Pass |
3-24-26: interior wall framing along the north side of building (warehouse side) approved. Okay to insulate & install drywall at progress areas. (pending wall framing at doors). |
| 03/25/2026 |
COT - LCBU - Framing |
|
Partial Pass |
3-25-26: partial pass pending engineer letter regarding bracing @4'. |
| 05/05/2026 |
COT - LCBU - Framing |
|
Partial Pass |
5-5-26: pending engineer letter regarding bracing @4'. Please submit engineer/architect's letter regarding listed above item to the city for review. There is nothing showing in system for this |
| 05/20/2026 |
COT - LCBU - Framing |
|
Partial Pass |
5-20-26: pending RFI review & approval. See previous notes. |
| 05/21/2026 |
COT - LCBU - Framing |
|
Partial Pass |
5-21-26: this inspection will be cleared out if & when revision letter is approved by the city. |
| 06/17/2026 |
COT - LCBU - Framing |
|
Re-inspection required |
6-17-26: add a gfci breaker for switch at break room, install metallic labeling at rooftop disconnects and identify circuit/purpose, provide power to tv & kitchen receptacles, pending framing RFI approval from city and outstanding conditions. |
| 06/22/2026 |
COT - LCBU - Framing |
|
Partial Pass |
6-22-26: pending city approval on framing RFI. |
| 06/25/2026 |
COT - LCBU - Framing |
|
Passed |
6-25-26: RFI for framing has been submitted to the city-Framing approved. |