Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2026 |
COT - LCBU - Building Final |
|
Re-inspection required |
5-21-26: tape any tears regardless of size on existing HVAC trunks. Mechanical intermediates approved but will check for corrections at building final. |
|
COT - LCBU - Building Final |
|
Re-inspection required |
6-17-26: add a gfci breaker for switch at break room, install metallic labeling at rooftop disconnects and identify circuit/purpose, provide power to tv & kitchen receptacles, pending framing RFI approval from city and outstanding conditions. |
| 06/22/2026 |
COT - LCBU - Building Final |
|
Partial Pass |
6-22-26: pending city approval on framing RFI. |
| 06/25/2026 |
COT - LCBU - Building Final |
|
Passed |