Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2026 |
COT - LCEL - Electrical Final |
|
Re-inspection required |
6-17-26: add a gfci breaker for switch at break room, install metallic labeling at rooftop disconnects and identify circuit/purpose, provide power to tv & kitchen receptacles, pending framing RFI approval from city and outstanding conditions. |
| 06/17/2026 |
COT - LCEL - Electrical Final |
|
Re-inspection required |
6-17-26: add a gfci breaker for switch at break room, install metallic labeling at rooftop disconnects and identify circuit/purpose, provide power to tv & kitchen receptacles, pending framing RFI approval from city and outstanding conditions. |
| 06/22/2026 |
COT - LCEL - Electrical Final |
|
Passed |
6-22-26: electrical final approved. |
| 06/22/2026 |
COT - LCEL - Electrical Final |
|
Passed |
6-22-26: electrical final approved. |