Permit: TC-COM-0923-02239
Permit Details
Apply Date:
09/19/2023
Applicant:
Brad Davis
Description:
THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
Permit Reviews
Permit Number - TC-COM-0923-02239
Permit Status: Issued
Permit Description: THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/26/2025 | APPROVED |
| 08/19/2024 | RESTAMP - COMMERCIAL v.1 | 08/21/2024 | APPROVED |
| 01/03/2024 | COMMERCIAL REVIEW - FULL v.4 | 01/09/2024 | APPROVED |
| 01/09/2024 | RESTAMP - COMMERCIAL v.1 | 01/10/2024 | APPROVED |
| 06/06/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/10/2024 | REQUIRES RESUBMIT |
| 10/27/2023 | COMMERCIAL REVIEW - FULL v.2 | 12/08/2023 | REQUIRES RESUBMIT |
| 12/20/2023 | COMMERCIAL REVIEW - FULL v.3 | 01/02/2024 | REQUIRES RESUBMIT |
| 08/13/2024 | COMMERCIAL REVIEW - FULL v.2 | 08/19/2024 | APPROVED |
| 12/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/11/2025 | REQUIRES RESUBMIT |
| 09/20/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/23/2023 | REQUIRES RESUBMIT |
| 09/03/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0923-02239
Permit Status: Issued
Permit Description: THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/10/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
| 11/14/2023 | Prior to project being finalized applicant must provide recordation information for the new proposed aerial easement in the right of way along Jackson Street. |
Conditions
Permit Number - TC-COM-0923-02239
Permit Status: Issued
Permit Description: THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
| Date | Description | Comments |
|---|---|---|
| 01/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/16/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 01/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/09/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 01/09/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 01/09/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 01/09/2024 | Masonry Inspection Report submittal review is required. | |
| 09/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/09/2024 | SPECIAL INSPECTION FOR SPRAY-APPLIED FIRE PROOFING IS REQUIRED. | |
| 01/09/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 01/09/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0923-02239
Permite Description: THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Electric conduits for Secondary Electric System (5 at 4 “, 7 at 3”, 2,at 1 1/2”. Conduits to electric room, house panels, fire riser panel. Ok to cover progress areas. |
| 03/24/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed. 9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed. 9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed. 9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed. 10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed. 10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed. 10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed. 10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed. 3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout. 6/28/24: reinforcement per plan at elevator shaft slab. Ok to proceed. 7/2/24: Stair tower Mat slab @ Gridline C-E/11-13 ok to proceed. 3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout. 318/25: 4th lift approved 24'-30' 3/24/25: reinforcement per approved at south west stair tower. Ok to proceed with concrete placement top out at 76'8". |
| 06/12/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Level #1; in wall electric for rooms and corridors. |
| 06/12/2025 | COT - HCME - Mechanical Progress | N/A | Partial Pass | Duct systems in room units and corridors. |
| 07/21/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Level #1. room units. Ok to. over ceilings. |
| 07/21/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Level #1, room units. OK to cover ceilings. |
| 07/21/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Level #1, room units. Ok to cover ceilings. |
| 09/24/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Level #4 Room units 401 - 413. |
| 05/30/2025 | COT - HCBU - Framing | N/A | Partial Pass | Corridor walls and ceilings. |
| 03/24/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed. 9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed. 9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed. 9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed. 10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed. 10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed. 10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed. 10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed. 3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout. 6/28/24: reinforcement per plan at elevator shaft slab. Ok to proceed. 7/2/24: Stair tower Mat slab @ Gridline C-E/11-13 ok to proceed. 3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout. 318/25: 4th lift approved 24'-30' 3/24/25: reinforcement per approved at south west stair tower. Ok to proceed with concrete placement top out at 76'8". |
| 12/12/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Ufer in place at area GL: 1 - 12/A - E. |
| 11/26/2025 | COT - BULD - SWG Clearance | N/A | Partial Pass | 11/26/25: Gas pressure test approved. Pending tracer wire before backfill is approved |
| 12/26/2025 | COT - HCBU - TCO | N/A | Partial Pass | 12/26/25: OKAY FOR LEVEL 1 TCO FOR FIRST FLOOR ONLY. |
| 12/24/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | |
| 12/26/2025 | ENGR Engineering Final | N/A | Partial Pass | Okay for level 1 TCO- 1st floor only. |
| 06/23/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | Level #3; corridor walls and ceilings framed. Ok to cover walls and ceilings. Level #4, Room units: hold downs are in place for all room units. |
| 02/10/2026 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 2/9/26: Above ceiling approved 7th floor units. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0923-02239
Permit Description: THIS PROJECT IS A 7-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 85 1-BEDROOM (585 NSF) DWELLING UNITS FOR THE ELDERLY. - BLDG A
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | ||
| 10/03/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 10/03/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/03/2025 | COT - HCPL - Gas Pressure Test | Passed | ||
| 10/08/2025 | COT - HCBU - Framing | Passed | ||
| 10/09/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/09/2025 | COT - HCBU - Masonry Pregrout | Passed | ||
| 10/09/2025 | COT - HCBU - Preslab | Passed | ||
| 10/09/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 10/09/2025 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 12/03/2025 | COT - HCPL - Rough Soil | Passed | Lint trap installed. Ok to cover progress area. | |
| 01/21/2026 | BULD - Electrical Clearance | Passed |