Permit: TC-COM-0923-02239

Parcel: 117130410


Addresses:

20 E OCHOA ST

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Date Description Inspector Results Comments
03/14/2025 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed.
9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed.
10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed.
10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed.
10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed.
10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed.
3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout.
03/18/2025 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed.
9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed.
10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed.
10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed.
10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed.
10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed.
3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout.
6/28/24: reinforcement per plan at elevator shaft slab. Ok to proceed.
7/2/24: Stair tower Mat slab @ Gridline C-E/11-13 ok to proceed.
3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout.
318/25: 4th lift approved 24'-30'
03/24/2025 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed.
9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed.
10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed.
10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed.
10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed.
10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed.
3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout.
6/28/24: reinforcement per plan at elevator shaft slab. Ok to proceed.
7/2/24: Stair tower Mat slab @ Gridline C-E/11-13 ok to proceed.
3/14/25: stair tower south reinforced per plan from 0'-4' ok to proceed with grout.
318/25: 4th lift approved 24'-30'
3/24/25: reinforcement per approved at south west stair tower. Ok to proceed with concrete placement top out at 76'8".
08/23/2024 COT - HCBU - Masonry Pregrout  Partial Pass Elevator pit at 0’ - 4’, North stair stem wall at 16”, South stair stem wall at 16”: OK to grout progress areas.
09/16/2024 COT - HCBU - Masonry Pregrout  Partial Pass North stair tower CMU Walls at 0’ - 6’2”: GL: 11 - 13/ C - D.5. Elevator at 0’ - 6’2” at GL: 6.5 - 7.5/C - D. South stair tower at GL: C - D/3 - 4: 0’ - 6’2”. OK to place grout in progress areas.
09/17/2024 COT - HCBU - Masonry Pregrout  Partial Pass South stair tower at 6’2’ - 12’2” at GL: 11 -13/C - D; Elevator pit at 6’2’ - 12’ 2” at GL: 6.5 - /C - D. OK to place grout in progress areas.
09/23/2024 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
09/24/2024 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
09/25/2024 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
9/25/24: North stairwell at 45 above finish floor reinforcement per plan ok to proceed.
10/04/2024 COT - HCBU - Masonry Pregrout  Partial Pass 9/23/24: north stairwell at 32' Above finish floor reinforcement per plan ok to proceed, elevator CMU wall at 32' Above finish floor reinforcement per plan ok to proceed.
9/24/24: North stairwell at 36' above finish floor reinforcement per plan plan ok to proceed. Elevator CMU wall at 36' above finish floor reinforcement per plan ok to proceed.
9/25/24: North stairwell at 45' above finish floor reinforcement per plan ok to proceed.
9/30/24: North stairwell at 51' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 51' above finish floor, reinforcement per plan ok to proceed.
10/1/24: North stairwell at 57' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 57' above finish floor, reinforcement per plan ok to proceed.
10/2/24: North stairwell at 63' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 63' above finish floor, reinforcement per plan ok to proceed.
10/3/24:North stairwell at 69' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 69' above finish floor, reinforcement per plan ok to proceed.
10/4/24: North stairwell at 76' above finish floor, reinforcement per plan ok to proceed, Elevator CMU wall at 76' above finish floor, reinforcement per plan ok to proceed.
10/09/2025 COT - HCBU - Masonry Pregrout  Passed