Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: TC-COM-0923-02239

Parcel: 117130410


Addresses:

20 E OCHOA ST

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
02/25/2026 ENGR Engineering Final Partial Pass Exterior inspection Okay for level 4 TCO, 1st floor only. No renewal option without permanent grill/grate/handrail installation. TCO renewal inspection required.
03/31/2026 ENGR Engineering Final Partial Pass Okay to apply for a Level 4 TCO. Floors 1-4
04/13/2026 ENGR Engineering Final Partial Pass Okay to apply for Level 4 TCO, floors 1-5
04/21/2026 ENGR Engineering Final Not Ready Provide necessary documentation as required by Building Inspection.
04/24/2026 ENGR Engineering Final Passed
12/26/2025 ENGR Engineering Final Partial Pass Okay for level 1 TCO- 1st floor only.