Permit: TC-COM-0725-01339
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1660 W VALENCIA RD
Address NEW:
1660 W VALENCIA RD
Apply Date:
07/10/2025
Applicant:
Andrew Venne
Description:
Tenant Improvement
Permit Reviews
Permit Number - TC-COM-0725-01339
Permit Status: Complete
Permit Description: Tenant Improvement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/07/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/07/2025 | REQUIRES RESUBMIT |
| 08/08/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/19/2025 | APPROVED |
| 07/15/2025 | COMMERCIAL REVIEW - FULL v.1 | 08/06/2025 | REQUIRES RESUBMIT |
| 04/16/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/17/2026 | APPROVED |
| 04/01/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/02/2026 | REQUIRES RESUBMIT |
| 08/19/2025 | RESTAMP - COMMERCIAL v.1 | 08/19/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0725-01339
Permit Status: Complete
Permit Description: Tenant Improvement
| Date | Description | Comments |
|---|---|---|
| 08/06/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/19/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 07/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/18/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0725-01339
Permite Description: Tenant Improvement
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 12-19-25: not applicable. |
| 09/12/2025 | COT - LCBU - Framing | N/A | Partial Pass | 9/12/25: A small fur-out wall has been constructed over the plumbing in the Boy's restroom. Approved |
| 03/24/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 3-24-26: not applicable |
| COT - FCON - Fire - Final | N/A | Not Ready | Need to remove exit sign on north door testing building, Need to and a riser room sign and facp sign on exterior door and exterior door leading to the riser and alarm panel. | |
| 12/19/2025 | COT - LCBU - Building Final | N/A | Not Ready | 12-19-25: not ready. |
| 12/19/2025 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 12-19-25: missing light and receptacle covers in office area, seal penetrations at demising wall and above ceiling at at office areas, re-label junction above above ceiling at east demising wall. Per NEC 300.11, you cannot use seismic wiring to support above ceiling junction boxes. Junction boxes must be independently, securely anchored from support from the structure above (joists/decking), with specific, distinguishable from "seismic bracing" wires. Panels-schedules and rooftop will be inspected at re-inspection. |
| 12/19/2025 | COT - LCPL - Plumbing Final | N/A | Not Ready | 12-19-25: not ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0725-01339
Permit Description: Tenant Improvement
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2025 | COT - LCPL - Rough Soil | Passed | 9/5/25: Plumbing underground for (5)P-1 fixtures and (1)P-2 fixture per approved plans. Water test to a 10' stack which included DWV in wall rough-in for all plumbing fixtures. Ok To proceed with backfill | |
| 12/19/2025 | COT - LCPL - Plumbing Above Ceiling | Passed | 12-19-25: approved. | |
| 12/19/2025 | COT - LCBU - Framing | Passed | 12-19-25: approved. | |
| 01/05/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 01/05/2026 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 03/24/2026 | COT - LCME - Mechanical Final | Passed | 3-24-26: approved. | |
| 03/24/2026 | COT - LCEL - Electrical Intermediate | Passed | 3-24-26: approved. | |
| 03/24/2026 | COT - LCPL - Plumbing Intermediate | Passed | 3-24-26: approved. | |
| 03/24/2026 | COT - FCON - Alarm - Final | Passed | ||
| 03/24/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/24/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/24/2026 | COT - LCBU - Preslab | Passed | 3-24-26: approved. | |
| 03/24/2026 | COT - LCME - Mechanical Intermediate | Passed | 3-24-26: approved. | |
| 03/26/2026 | COT - FCON - Fire - Final | Passed | ||
| 03/27/2026 | COT - LCBU - Building Final | Passed | 3-27-26: building final approved. | |
| 03/27/2026 | COT - LCEL - Electrical Final | Passed | 3-27-26: electrical final approved. | |
| 03/27/2026 | COT - LCPL - Plumbing Final | Passed | 3-27-26: plumbing final approved. |