Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - LCEL - Electrical Final |
|
Re-inspection required |
3-24-26: install knee guards at restroom lavatories, adjust men's/girl's restroom doors to 5 pounds of pressure, install permanent labels at panels, seal all horizontal penetrations at firewall, label junction box near front office, remove exit sign above the northeast back classroom's door, install building address to where it's visible from parking lot. |
| 03/27/2026 |
COT - LCEL - Electrical Final |
|
Passed |
3-27-26: electrical final approved. |
| 12/19/2025 |
COT - LCEL - Electrical Final |
|
Re-inspection required |
12-19-25: missing light and receptacle covers in office area, seal penetrations at demising wall and above ceiling at at office areas, re-label junction above above ceiling at east demising wall. Per NEC 300.11, you cannot use seismic wiring to support above ceiling junction boxes. Junction boxes must be independently, securely anchored from support from the structure above (joists/decking), with specific, distinguishable from "seismic bracing" wires. Panels-schedules and rooftop will be inspected at re-inspection. |