Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
06/24/2024
Applicant:
Alan Katz
Description:
Interior Remodel

Permit Reviews

Permit Number - TC-COM-0624-01195
Permit Status: Issued
Permit Description: Interior Remodel
Start Date Submittal Complete Date Status  
04/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/24/2025 APPROVED Review Details
08/06/2024 COMMERCIAL REVIEW - FULL v.2 09/11/2024 REQUIRES RESUBMIT Review Details
09/25/2024 RESTAMP - COMMERCIAL v.1 09/26/2024 APPROVED Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.1 08/01/2024 REQUIRES RESUBMIT Review Details
09/13/2024 COMMERCIAL REVIEW - FULL v.3 09/18/2024 REQUIRES RESUBMIT Review Details
09/18/2024 COMMERCIAL REVIEW - FULL v.4 09/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0624-01195
Permit Status: Issued
Permit Description: Interior Remodel
Date Description Comments
06/26/2024 Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512
08/08/2024 AIR BALANCING REPORT IS REQUIRED.
06/26/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/31/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
07/31/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0624-01195
Permite Description: Interior Remodel
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
10/28/2024 COT - HCPL - Rough Soil N/A Partial Pass DWV only.
12/27/2024 COT - HCBU - Framing N/A Partial Pass Partial pass. Revision has been sent in to match all framing in field. Okay to proceed progress areas at own risk. 12/27/2024
02/26/2025 COT - HCEL - Electrical Above Ceiling N/A Canceled
02/26/2025 COT - HCME - Mechanical Above Ceiling N/A Canceled
02/26/2025 COT - HCPL - Plumbing Above Ceiling N/A Canceled
12/27/2024 COT - HCME - Mechanical Intermediate N/A Partial Pass Per previous notes. 12/27/2024
12/27/2024 COT - HCPL - Plumbing Intermediate N/A Partial Pass Plumbing corrections have been made okay to proceed progress areas. 12/27/2024
12/27/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass Receptacles that have been removed from the plans have been submitted for revision. Okay to proceed progress areas. 12/27/2024
04/25/2025 COT - HCPL - Plumbing Final N/A Re-inspection required install all sinks
05/08/2025 COT - HCBU - TCO N/A Not Applicable All work complete
06/26/2025 COT - FCON - Fire - Final N/A Partial Pass Remove old bell. Exit discharge lighting. Exit sign on patio gate. FDC sign. Knoxbox. FACP sign on back gate. Remove exit sign from rear exit.(or make door and gate compliant). Approved for level 4 TCO.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0624-01195
Permit Description: Interior Remodel
Total Completed Inspections - 25
Date Description Inspector Results Comments
10/28/2024 COT - HCEL - Electrical Underground Passed
11/04/2024 COT - HCBU - Preslab Passed
11/04/2024 COT - HCPL - Rough Soil Passed
01/10/2025 COT - HCBU - Interior Shear Bracing Passed
01/10/2025 COT - HCBU - Framing Passed
03/03/2025 COT - HCEL - Electrical Above Ceiling Passed
03/03/2025 COT - HCME - Mechanical Above Ceiling Passed
03/03/2025 COT - HCPL - Plumbing Above Ceiling Passed
03/03/2025 COT - HCBU - Building Above Ceiling Passed
04/17/2025 COT - HCPL - Gas Pressure Test Passed
04/17/2025 COT - BULD - SWG Clearance Passed SWG
04/17/2025 COT - HCME - Mechanical Intermediate Passed
04/17/2025 COT - HCPL - Plumbing Intermediate Passed
04/25/2025 ENGR Engineering Final Passed Site is good. CofO ready.
04/25/2025 TRSP - ROW - Final/Close-Out Passed
04/25/2025 COT - HCEL - Electrical Final Passed
04/25/2025 COT - HCEL - Electrical Intermediate Passed
04/25/2025 COT - HCME - Kitchen Hood Passed
04/25/2025 COT - HCME - Mechanical Final Passed
04/25/2025 COT - HCPL - Gas Final Passed
04/29/2025 COT - FCON - Hood System - Final Passed approved on 4/28
05/07/2025 COT - HCBU - Building Final Passed
05/07/2025 COT - HCPL - Plumbing Final Passed
06/26/2025 COT - FCON - Alarm - Final Passed
06/26/2025 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
FINAL REPORT NC2504-002 PHILLIP'S PLUMBING-2025-04-23_V1.PDF DOCUMENTS VIEW
SEIS KITCHEN AT TANQUE VERDE - TAB REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
124163 SEIS KITCHEN - MILLIES CALCULATION PACKAGE - 3 - COPY_V1.PDF DOCUMENTS VIEW
24091 SYSTEMS DESIGN REPORT_3 - COPY_V2.PDF DOCUMENTS VIEW
CONS-4_A-1 THRU 33 SEIS KITCHEN 09-18-24 MILLIES PANCAKE HOUSE_D3_V4.PDF DOCUMENTS VIEW