Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 11/20/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Grease trap. | |
| 12/24/2024 | COT - HCPL - Plumbing Intermediate | Re-inspection required | Grease trap. 12/24/24: DWV running through metal studs must be protected with approved method, nail plates required throughout to prevent damage to pex lines in walls, access panels required for A.V.V and water hammer arrestors, receptacles missing per plan throughout, framing not per plan throughout. |
|
| 12/27/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Plumbing corrections have been made okay to proceed progress areas. 12/27/2024 |