Permit: TC-COM-0424-00664
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
7373 E VALENCIA RD
Address NEW:
7373 E VALENCIA RD
Apply Date:
04/12/2024
Applicant:
alex enoch
Description:
PREFAB MTL BLDG SMALL INERIOR BUILD OUT FOR BREAK ROOM AND BATHROOM REV1: Electrical updated to reflect 200A SES. REV 2: MOVED PARTITION WALL OVER 4’-9”. Electrical Moved. No change to mech and plumb
Permit Reviews
Permit Number - TC-COM-0424-00664
Permit Status: Complete
Permit Description: PREFAB MTL BLDG SMALL INERIOR BUILD OUT FOR BREAK ROOM AND BATHROOM
REV1: Electrical updated to reflect 200A SES.
REV 2: MOVED PARTITION WALL OVER 4’-9”. Electrical Moved. No change to mech and plumb
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/15/2024 | COMMERCIAL REVIEW - LIMITED v.4 | 08/28/2024 | REQUIRES RESUBMIT |
| 09/05/2024 | RESTAMP - COMMERCIAL v.1 | 09/09/2024 | APPROVED |
| 06/14/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 07/01/2024 | REQUIRES RESUBMIT |
| 12/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/12/2024 | REQUIRES RESUBMIT |
| 07/09/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 07/24/2024 | REQUIRES RESUBMIT |
| 06/09/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/23/2025 | APPROVED |
| 09/05/2024 | COMMERCIAL REVIEW - LIMITED v.5 | 09/05/2024 | APPROVED |
| 01/30/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/03/2025 | APPROVED |
| 07/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/11/2025 | APPROVED |
| 04/17/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 05/03/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0424-00664
Permit Status: Complete
Permit Description: PREFAB MTL BLDG SMALL INERIOR BUILD OUT FOR BREAK ROOM AND BATHROOM
REV1: Electrical updated to reflect 200A SES.
REV 2: MOVED PARTITION WALL OVER 4’-9”. Electrical Moved. No change to mech and plumb
| Date | Description | Comments |
|---|---|---|
| 07/23/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/19/2024 | ENGINEERED MTL BLDG DWGS and Calculations must be submitted and approved prior to Final Inspection | |
| 07/23/2024 | Installation of the septic system must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/23/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00664
Permite Description: PREFAB MTL BLDG SMALL INERIOR BUILD OUT FOR BREAK ROOM AND BATHROOM
REV1: Electrical updated to reflect 200A SES.
REV 2: MOVED PARTITION WALL OVER 4’-9”. Electrical Moved. No change to mech and plumb
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 6-10-25: not applicable |
| 06/10/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 6-10-25: not applicable |
| 06/18/2025 | COT - LCPL - Plumbing Final | N/A | Partial Pass | All corrections were made. Prior to final an air balance report along with a water sterilization report is required. 6/18/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00664
Permit Description: PREFAB MTL BLDG SMALL INERIOR BUILD OUT FOR BREAK ROOM AND BATHROOM
REV1: Electrical updated to reflect 200A SES.
REV 2: MOVED PARTITION WALL OVER 4’-9”. Electrical Moved. No change to mech and plumb
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2024 | COT - LCPL - Rough Soil | Passed | Plumbing per plan and on test. Okay to back fill progress areas under slab. Shading required. 10/10/2024 | |
| 10/16/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Rebar and footings per plan. Okay for concrete placement. 10/16/2024 | |
| 10/16/2024 | COT - LCEL - Grounding/Bonding | Passed | 3/0 UFER in place and secured to bottom of rebar. 10/16/2024 | |
| 01/08/2025 | COT - LCBU - Building Final | Passed | Metal shell building is complete per structural design. Tenant improvements ongoing on interior of building under a separate permit. Okay to issue Letter of Completion for this permit. | |
| 02/25/2025 | COT - LCBU - Roof Nailing | Passed | 2-25-25, roof nailing approved. | |
| 02/25/2025 | COT - LCBU - Preslab | Passed | 2-25-25, previously inspected and approved. | |
| 02/28/2025 | COT - LCBU - Framing | Passed | ||
| 02/28/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 02/28/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 02/28/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/28/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 06/10/2025 | COT - FCON - Fire - Final | Passed | ||
| 06/10/2025 | COT - LCEL - Electrical Final | Passed | 6-10-25: electrical final approved. | |
| 06/10/2025 | ENGR Engineering Final | Passed | 06/10/25, All drainage items have been corrected and ADA parking has been fixed. | |
| 06/10/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed on private property. No damage to right of way. | |
| 06/10/2025 | COT - LCEL - Electrical Underground | Passed | 6-10-25: approved | |
| 06/10/2025 | COT - LCPL - Yard Water Line | Passed | 6-10-25: approved | |
| 06/10/2025 | COT - LCEL - Outdoor Lighting | Passed | 6-10-25: approved | |
| 06/20/2025 | COT - HCBU - TCO | Passed | Okay for full CofO. 6/20/2025 | |
| 06/17/2025 | COT - LCME - Mechanical Final | Passed | 6/17/2025 approved. All corrections were made. | |
| 06/20/2025 | COT - LCPL - Plumbing Final | Passed | Approved. Reports have been uploaded and are under review. 6/20/2025 |